首页> 外文会议>International Conference on Industrial Technology and Management >The integrated multi-quay Berth Allocation and Crane Assignment Problem: Formulation and case study
【24h】

The integrated multi-quay Berth Allocation and Crane Assignment Problem: Formulation and case study

机译:集成式多码头泊位分配和起重机分配问题:公式和案例研究

获取原文

摘要

In the literature, some works deal with the integrated Berth Allocation and Crane Assignment Problem (BACAP) in container and bulk port context. Most of them consider that equipment are always available and high tide periods restriction is not imposed. In this work, we were interested by the BACAP under availability and high tide time windows restrictions in bulk port terminal. We proposed a mixed integer programming model for the problem and then, validated it by studying the real-case of Jorf lasfar Phosphate Hub (JPH). Preliminary computational experiments show some promising research opportunities.
机译:在文献中,一些工作涉及集装箱和散货港口环境中的综合泊位分配和起重机分配问题(BACAP)。他们中的大多数人认为设备总是可用的,潮汐时段不加限制。在这项工作中,BACAP对散装端口终端的可用性和高潮时间窗口限制感到感兴趣。我们针对该问题提出了一个混合整数规划模型,然后通过研究Jorf lasfar磷酸盐枢纽(JPH)的实际情况对其进行了验证。初步的计算实验显示了一些有前途的研究机会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号