【24h】

Risk Analysis and Management of Software VV Activities in NPPs

机译:核电厂软件V&V活动的风险分析与管理

获取原文

摘要

The life cycle of software can be divided into the concept, requirements, design, construction and integration phase and so on. The risk analysis and management should been executed during the software life cycle. The risks of the instrumentation and control (I&C) system include the technical and management risks. The concern of risk analysis is different in the software life cycle. The verification and validation (V&V) effort may identify the technical and management risks that have a measureable possibility of negative consequences to I&C system in nuclear power plants (NPPs). The risk analysis is one of the minimum tasks of the software verification and validation. The IEEE 1012-2017 Annex J has described the risk analysis, risk estimation and risk evaluation in general. The risks of the software V&V activities will be identified in this paper. Based on the risks of the software V&V activities, the risk management strategy has been proposed.
机译:软件的生命周期可以分为概念,需求,设计,构造和集成阶段等。风险分析和管理应在软件生命周期内执行。仪表和控制(I&C)系统的风险包括技术和管理风险。风险分析的关注点在软件生命周期中有所不同。验证和确认(V&V)工作可以识别可能对核电厂(NPP)的I&C系统产生负面影响的可衡量可能性的技术和管理风险。风险分析是软件验证和确认的最低任务之一。 IEEE 1012-2017附件J总体上描述了风险分析,风险估计和风险评估。本文将确定软件V&V活动的风险。基于软件V&V活动的风险,提出了风险管理策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号