首页> 外文会议>IEEE Conference on Energy Internet and Energy System Integration >Risk Assessment of Power System with Large-Scale Wind Power Connected Considering the Time-Sequence Characteristic of Wind Power Ramp Event
【24h】

Risk Assessment of Power System with Large-Scale Wind Power Connected Considering the Time-Sequence Characteristic of Wind Power Ramp Event

机译:考虑风电斜坡事件时间序列特征的大型风电并网电力系统风险评估

获取原文

摘要

A power system risk assessment model considering the time-sequence characteristic of wind power ramp events is pro-posed in this paper. By sampling the possible shutdown time and operation state of conventional units, the effect of time-sequence relation between wind power ramp events and the outage of conventional units is considered. In the evaluation process, the correlation between time intervals is taken into account, and the operating risk of the system is assessed by with times of frequency off-limits and loss load expectation. This assessment result the impact of wind power ramp events on system operation risks and provides guidance for the dispatcher to take preventive and control measures, which has practical application and reference value.
机译:提出了一种考虑风电斜坡事件时间序列特征的电力系统风险评估模型。通过对常规机组可能的停机时间和运行状态进行采样,可以考虑风电斜坡事件与常规机组停机之间时间顺序关系的影响。在评估过程中,考虑了时间间隔之间的相关性,并通过频率超限和损失负载预期的时间来评估系统的操作风险。该评估结果对风电匝道事件对系统运行风险的影响提供了指导,为调度员采取预防和控制措施提供了指导,具有实际应用价值和参考价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号