首页> 外文会议>International congress and exhibition on sustainable civil infrastructures >Abu Hamour Tunnel Phase I the First TBM Tunnel in Qatar: The Art of Tunneling in a New World
【24h】

Abu Hamour Tunnel Phase I the First TBM Tunnel in Qatar: The Art of Tunneling in a New World

机译:阿布哈马尔隧道第一期卡塔尔第一条TBM隧道:新世界中的隧道艺术

获取原文

摘要

Abu Hamour (Musaimeer) Surface & Ground Water Drainage Tunnel - Phase I (AHSO) is a 9.5 km long, 3.7 m ID storm water tunnel. The writers created comprehensive geotechnical data collection system on the tunneling project in weak/soft rocks which has been successfully implemented. Results of geological mapping have been presented to show how they correlate to TBM performance. The authors make an attempt to correlate common classification systems: Q_w and RMR for rock mass commonly found in Doha, Qatar.
机译:阿布哈穆尔(Musaimeer)地面和地下水排水隧道-一期(AHSO)是一条9.5公里长,3.7 m内径的雨水隧道。作者在弱/软岩隧道工程中创建了全面的岩土数据收集系统,该系统已成功实施。地质制图的结果已经被提出来显示它们如何与TBM性能相关。作者试图将常见的分类系统相关联:卡塔尔多哈常见的岩体的Q_w和RMR。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号