首页> 外文会议>International congress and exhibition on sustainable civil infrastructures >Geotechnical Investigations and Proposal for Stabilization and Recovery Slope on Highway BR-010 Stretch in Aparecida do Rio Negro to Goiatins, Tocantins, Brazil
【24h】

Geotechnical Investigations and Proposal for Stabilization and Recovery Slope on Highway BR-010 Stretch in Aparecida do Rio Negro to Goiatins, Tocantins, Brazil

机译:在Aparecida的高速公路Br-010舒展和恢复坡度稳定和恢复坡度的岩土性调查和提案Do Rio Negro对粪便,Tocantins,巴西

获取原文

摘要

This article presents the results of geotechnical studies and proposals to stabilize embankments referring to cuts 16, 23, 25, 30 and 31 of the BR-010 referring to Aparecida do Rio Negro a Goiatins, State of Tocantins. The study consisted in the execution of a field incursions program for verification of geotechnical conditions along the indicated stretch, running lab tests, and stability analysis of embankments in order to indicate solutions to cuts made necessary for the completion of the highway. In terms of characterization of the problem, it presents part of the photographic survey conducted in November 2007 with the conditions of the most critical slopes. There is in the pictures that the side slopes to the highway were in the process of degradation and (or) progressive destabilization requiring urgent interventions aimed at mitigating the ongoing problems. In terms of geometry, the slope had heights up to approximately 35 m. To determine the parameters necessary to verify the stability of embankments using three undeformed blocks corresponding soil to cuts 25 and 31. Samples of identifications are presented and the summary of the results of geotechnical tests performed and certain parameters. In laboratory tests, it was found that the strength parameters (cohesion and angle of friction) diverged somewhat from the usual laboratory parameters obtained in soils. This behavior was due to the fact that the heterogeneity of the samples for the presence mainly of discontinuities in the collected blocks. Before the run stability analysis and field surveys, it was found, the need for actions aimed at solving problems for marginal slope to the highway. Thus, due to the proximity of the intense rainy season, it was proposed the reconstruction of slope with surface protection of them aimed at stabilization and protection against erosion, as well as the execution of superficial and deep drainage. Aiming to further verify the possible degradation of the slopes by rain, was sought in INMET's website (National Institute of Meteorology) precipitation to the region. It was found that for the time in January, February and March rainfall is considerably high, which could further compromise the integrity of the executed cuts. Faced with this possibility, he indicated consider the emergency actions that could prevent this degradation. Actions such as the reduction and protection of embankments shown in the study.
机译:本文介绍了岩土学研究的结果和提案,以稳定BR-010的切口16,23,25,31和31的堤防,参考Aparecida Do Rio Negro A roiatins,毒素状态。该研究在执行现场侵占方案中,用于沿着指示的拉伸,运行实验室测试和堤防稳定性分析验证岩土条件,以指示在完成公路完成所必需的切割的解决方案。在问题的表征方面,它提出了2007年11月在2007年11月进行的部分摄影调查,其中包括最关键的斜坡的条件。在这些照片中,高速公路的侧倾在降解过程中,(或)逐步稳定化需要紧急干预措施旨在减轻持续的问题。在几何形状方面,斜坡高达约35米。为了确定使用三个未变形的块对应的土壤来验证堤防稳定性所需的参数,以切割25和31.呈现了识别样本,并进行了岩土考试结果的概述和某些参数。在实验室测试中,发现强度参数(摩擦的内聚力和角度)略微来自土壤中获得的通常的实验室参数。这种行为是由于样品的异质性主要是收集块中的不连续性的存在。在运行稳定性分析和现场调查之前,找到了旨在解决对高速公路边缘坡面问题的行动。因此,由于强烈的雨季接近,建议将坡度的重建与它们的表面保护,旨在稳定和保护侵蚀,以及执行浅表和深排水。旨在进一步验证下雨的斜坡可能降解,在Inmet的网站(国家气象学)降水到该地区。有人发现,对于1月份的时间,2月和3月的降雨量大大高,这可能进一步损害被执行的削减的完整性。面对这种可能性,他表示考虑到可能阻止这种退化的紧急行动。诸如研究中显示的堤防的减少和保护等行为。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号