首页> 外文会议>Chinese Control and Decision Conference >Application of extremal optimization approach to the integrated scheduling problem of continuous casting and hot rolling process
【24h】

Application of extremal optimization approach to the integrated scheduling problem of continuous casting and hot rolling process

机译:极值优化方法在连铸与热轧过程综合调度中的应用

获取原文

摘要

Making an integrated schedule on both continues casting (CC) and hot rolling (HR) process in steel-making lines is a difficult problem since the balance of material flow, the continuity of production, the hot charge rate as well as the coupling between successive stages should be taken into consideration together. Therefore, few approaches have been published to solve the multistage integrated scheduling problem and applied to the real systems in practice. In this study, a novel modified Extremal Optimization (EO) algorithm combining exact mathematical model on CC stage and a heuristic algorithm on HR stage is proposed to solve the scheduling problem with less computational effort, and has been successfully applied to a real plant. The industrial application results show that compared with manual scheduling, considerable improvement in hot charge rate is achieved, leading to large energy-saving for the steel maker.
机译:在炼钢生产线的连续铸造(CC)和热轧(HR)过程中制定综合计划是一个难题,因为物料流,生产的连续性,热装料率以及连续进料之间的平衡是平衡的应同时考虑各个阶段。因此,很少有方法可以解决多阶段集成调度问题,并且在实践中没有应用于实际系统。在这项研究中,提出了一种新颖的改进的极值优化(EO)算法,该算法结合了CC阶段的精确数学模型和HR阶段的启发式算法,以较少的计算量解决了调度问题,并已成功地应用于实际工厂。工业应用结果表明,与手动调度相比,热装料率有了显着提高,从而为钢铁企业节省了大量能源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号