首页> 外文会议>International conference on nuclear engineering >PRELIMINARY STUDY ON RISK-INFORMED LBLOCA OF CPR1000
【24h】

PRELIMINARY STUDY ON RISK-INFORMED LBLOCA OF CPR1000

机译:CPR1000的风险信息相关的LBLOCA的初步研究

获取原文

摘要

The safety assessment approach of nuclear power plants (NPPs) has been evolved with the technological progress and the lessons learned from the major events. Recently, the risk-informed analysis methodology combined probabilistic safety assessment (PSA) and traditional deterministic methodology has been a hot topic. Following the Risk-Informed Analysis Methodology, the PCT margin of CPR1000 Nuclear Power Plant was re-evaluated in this paper. In the PSA analysis, 162 probabilistic sequences had been identified after LBLOCA occurs. Then 18 probabilistically significant sequences were selected for the deterministic methodology analysis with deterministic realistic method (DRM) for CPR1000 NPP. With calculated PCT of each dominant sequence, a load spectrum of PCT for LBLOCA was generated. Then the risk-informed PCT margin can be evaluated by two different methods, namely the expecting value estimation method and the sequence probability coverage method. In conclusion, it was found that the PCT margin evaluated by the Risk-Informed Analysis Methodology can be greater than that of the deterministic DRM methodology by 16~34°C.
机译:核电厂的安全评估方法随着技术进步和从重大事件中汲取的教训而得到了发展。近年来,结合概率安全评估(PSA)和传统确定性方法的风险分析方法已成为热门话题。根据风险分析方法,对CPR1000核电厂的PCT余量进行了重新评估。在PSA分析中,LBLOCA发生后已鉴定出162个概率序列。然后选择18个概率重要序列用于CPR1000 NPP的确定性现实方法(DRM)的确定性方法学分析。通过计算每个主要序列的PCT,可生成LBLOCA的PCT负载谱。然后,可以通过两种不同的方法来评估风险告知的PCT利润率,即期望值估计方法和顺序概率覆盖方法。总之,发现在16〜34°C时,通过风险知情分析方法论评估的PCT余量可以比确定性DRM方法学评估的PCT余量大。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号