In order to reserve a spare inner stator for the four generators in Daya Bay nuclear power base and solve several defects in Daya Bay unit 1, DNMC (Daya Bay Nuclear Power Operations And Management Co., Ltd.) bought a new inner stator with stainless steel water conducting coil bar and got the replacement work done on Daya Bay unit 1 during D117 outage in 2015. This paper describes the technological process and difficulties of the replacement work. As some of the domestic large capacity power generators are getting older, it will be used for reference.
机译:为了为大亚湾核电站基地的四台发电机预留备用内定子,并解决大亚湾核电站1号机组的若干缺陷,DNMC(大亚湾核电运营管理有限公司)购买了新的不锈钢内定子。钢水盘管,并在2015年D117停运期间在大亚湾1号机组完成了更换工作。本文介绍了更换的技术过程和困难。随着一些国内大容量发电机的老化,将作为参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号