首页> 外文会议>IEEE International Conference on Automation Science and Engineering >Rolling horizon planning with engineering activities in semiconductor supply chains
【24h】

Rolling horizon planning with engineering activities in semiconductor supply chains

机译:滚动地平线规划与半导体供应链中的工程活动

获取原文

摘要

Process improvement activities by engineering lots are crucial to stay competitive in the semiconductor market. Production and engineering lots compete for the same equipment. We discuss two production planning formulations for a simplified semiconductor supply chain. The first formulation assumes reduced available capacity for production, while the second one directly incorporates engineering activities. Additional capacity is considered in this formulation because of learning effects that represent process improvements. The integrated formulation outperforms the conventional formulation in a rolling horizon setting with respect to profit.
机译:工艺改进活动是工程批次在半导体市场保持竞争力的关键。生产和工程批次竞争相同的设备。我们讨论了简化半导体供应链的两种生产规划配方。第一种配方假设可用的生产能力降低,而第二个是直接融入工程活动。在本配方中考虑了额外的容量,因为学习效应表示过程改进。综合配方优于汇率在利润方面的汇总配方。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号