首页> 外文会议>International Conference on Live Maintenance >An innovative live working method to replace high voltage towers
【24h】

An innovative live working method to replace high voltage towers

机译:一种新颖的带电作业方法来代替高压塔

获取原文

摘要

In the field of high voltage live line maintenance RTE can rely on many methods for ordinary operations like replacing insulators, line hardware, or repairing damaged conductors. Nevertheless heavier maintenance is sometimes needed such as tower replacement. Therefore RTE has developed a new piece of equipment able to temporarily support the line while the tower is removed. This tool consists of a three phases holding beam lifted with a single crane. This article presents the new conductor support system and the feedback after the replacement of 24 towers on a 225 kV line in the western region of France (near Nantes).
机译:在高压带电线路维护领域,RTE可以依靠许多方法进行常规操作,例如更换绝缘子,线路硬件或修复损坏的导体。尽管如此,有时仍需要进行更大的维护,例如更换塔架。因此,RTE开发了一种新设备,能够在拆除塔架时临时支撑生产线。该工具由一个用一台起重机吊起的三相固定梁组成。本文介绍了新的导体支撑系统以及在法国西部(南特附近)的一条225 kV线路上更换24座塔之后的反馈。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号