Plymouth Road over Plymouth Creek: The Sinkhole that Stopped Traffic

机译:普利茅斯溪上的普利茅斯路:阻止交通的污水池

获取原文

摘要

The Plymouth Road bridge over Plymouth Creek in Montgomery County, Pennsylvania has always been plagued with sinkholes. In December 2014 a sinkhole surfaced adjacent to the downstream apron. By March of 2015 subsidence had migrated beneath the apron and east abutment and caused separation of the abutment from the superstructure and subsequently the bridge was closed on March 12th. Plymouth Road provides a vital link in the community due to its proximity to Interstates 276 and 476. The sudden closure required diversion of more than 15,500 motorists a day onto other heavily traveled roads in the region. Due to the extent of undermining and significant traffic impact of the closure, the Pennsylvania Department of Transportation decided to accelerate design and construction of the bridge replacement. A complete design package was delivered in a few short weeks and the project was moved to construction by April 27th. Construction was completed in August and included complete bridge replacement, a micropile foundation designed to withstand further sinkhole development beneath the bridge, repair of existing sinkholes, a concrete channel liner to control surface water, and grouting of the approach roadways and a portion of the downstream channel for stability in the karst terrain. Discussed in the paper are the history of sinkhole problems at the bridge, past remediation techniques, and the pertinent aspects of accelerated design and construction with a focus on the difficulties associated with karst terrain.
机译:宾夕法尼亚州蒙哥马利县普利茅斯溪上的普利茅斯路大桥一直到处都是水坑。 2014年12月,邻近下游停机坪的水槽浮出水面。到2015年3月,沉陷已迁移至停机坪和东基台下方,导致基台与上部结构分离,随后桥梁于3月12日关闭。普利茅斯路(Plymouth Road)由于靠近276号州际公路和476号州际公路而成为社区中的重要纽带。突然关闭,每天需要将超过15,500名驾驶者转移到该地区其他交通繁忙的道路上。由于关闭的破坏程度和重大的交通影响,宾夕法尼亚州交通运输部决定加快桥梁更换的设计和施工。短短几周内便交付了完整的设计包,该项目已于4月27日移至施工阶段。工程于八月完成,包括完整的桥梁更换,设计用于承受桥下进一步的深水坑的微桩基础,修复现有的深水坑,控制地表水的混凝土通道衬砌,以及引水道和下游部分的灌浆。喀斯特地形稳定通道。本文讨论了桥梁下沉问题的历史,过去的修复技术以及加速设计和施工的有关方面,重点是与喀斯特地形有关的困难。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号