D3 Rockfall Mitigation Project Interstate 15, Helena to Great Falls, Montana

机译:D3落石缓解项目15号州际公路,海伦娜到蒙大拿州大瀑布市

获取原文

摘要

Numerous rock slopes adjacent to Interstate 15 (1-15) between Helena and Great Falls, Montana have a history of hazardous rockfall activity requiring high levels of maintenance. The Montana Department of Transportation (MDT) is in the process of reducing the rockfall hazards in this corridor. In January 2011, MDT Geotechnical Section evaluated historical performance and existing conditions of the rock slopes in the corridor to develop rockfall ratings for prioritizing mitigation. MDT retained Landslide Technology (LT) of Portland, Oregon to conduct an independent rockfall evaluation of the corridor, and 15 sites were chosen for mitigation. LT developed conceptual mitigation options for each site. MDT selected mitigation options for development of final designs and divided the project into three phases to accommodate funding. Final design work began in 2014 and is ongoing. Mitigation includes slope scaling, rock bolting, draped mesh, rockfall attenuators, flexible rockfall barriers, and catchment area improvements via rock slope excavation. The development of temporary rockfall protection and traffic control designs was a significant challenge given the vital nature of the 1-15 corridor and MDT's requirement to perform the majority of the work, including scaling under live traffic. Construction of Phase 1 began in 2015 and was completed in June of 2016. Phase 2 began construction in the spring of 2016 and is projected to be completed by the fall of 2016. LT provided construction engineering (CE) services for Phase 1 and is currently providing CE on Phase 2. LT is developing final plans, specifications and engineer's estimate for the Phase 3 designs, which is currently projected to be let for construction in 2017. As with any design and construction project, several lessons have been learned on this project including items such as: unique nature observation of construction efforts for rockfall mitigation measures.
机译:蒙大拿州海伦娜和大瀑布之间的15号州际公路(1-15)附近的许多岩石斜坡都有危险的岩崩活动历史,需要高水平的维护。蒙大拿州运输部(MDT)正在努力减少该走廊的崩塌危险。 2011年1月,MDT土力工程处评估了走廊岩质边坡的历史性能和现有条件,以制定落石等级,以优先考虑缓解措施。 MDT保留了俄勒冈州波特兰市的Landslide Technology(LT)来对走廊进行独立的落石评估,并选择了15个地点进行缓解。 LT为每个站点开发了概念性的缓解方案。 MDT为最终设计的开发选择了缓解方案,并将该项目分为三个阶段以适应资金需求。最终设计工作于2014年开始,正在进行中。缓解措施包括坡度缩放,锚杆锚固,悬垂的网格,落石衰减器,灵活的落石屏障以及通过岩石边坡开挖来改善集水区。鉴于1-15走廊的至关重要性以及MDT要求执行大部分工作(包括在实况交通中进行缩放)的要求,临时岩崩防护和交通控制设计的开发是一项重大挑战。第一阶段的建设于2015年开始,并于2016年6月完成。第二阶段的建设于2016年春季开始,预计于2016年秋季完成。LT为第一阶段提供了建筑工程(CE)服务,目前在第2阶段提供CE。LT正在为第3阶段设计制定最终计划,规格和工程师估算,目前预计将在2017年进行建造。与任何设计和建造项目一样,该项目也吸取了一些教训。包括以下项目:针对岩崩减轻措施的施工努力的独特性质观察。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号