CPM Scheduling: Knowledge Sharing, Best Practices and Open Standards

机译:CPM计划:知识共享,最佳做法和开放标准

获取原文

摘要

CPM schedule management requires a better way for public and private companies to manage complex construction schedules. It takes sophisticated users to update and manage the system; project specifications are very prescriptive for what needs to be included, but the rules are rarely followed. Valuable time is wasted getting baseline schedules and schedule updates approved between contractors and consultants. This paper will research best practices for construction schedule management and seek innovative ways to collaborate on schedule management. The paper will also address how performance metrics can create transparency and accountability throughout the system with the integration of the concept of knowledge transfer, best practices real-time analysis and performance metrics.
机译:CPM进度表管理要求上市公司和私营公司有更好的方法来管理复杂的施工进度表。需要老练的用户来更新和管理系统;项目规范对需要包含的内容具有非常明确的规定,但是很少遵循规则。在承包商和顾问之间批准基准进度表和进度表更新浪费了宝贵的时间。本文将研究施工进度管理的最佳实践,并寻求创新的方式来进行进度管理协作。本文还将探讨性能指标如何通过知识转移,最佳实践实时分析和性能指标的集成来在整个系统中建立透明度和问责制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号