CPM Really Gets Interesting When You Consider Activity Status

机译:当您考虑活动状态时,CPM确实变得很有趣

获取原文

摘要

An activity without status is just a plan. The calculations involving the Critical Path Method (CPM) do not really get interesting until one considers the nature and effect of applying status to that activity. This paper dissects the very nature of status into its components and details the interaction of its parts. The 'hidden' events necessary for an actual start are discussed. The different uses for status are addressed. To be accurate and useable for forecasting, status must follow rules and be defined in such as way as to be reliably reproducible by different parties. CPM scheduling really gets interesting when you consider activity status.
机译:没有身份的活动只是一个计划。在人们考虑将状态应用于该活动的性质和影响之前,涉及关键路径法(CPM)的计算并没有真正引起人们的兴趣。本文将状态的本质剖析为其组成部分,并详细说明其各部分之间的相互作用。讨论了实际启动所需的“隐藏”事件。解决了身份的不同用途。为了准确并可用于预测,状态必须遵循规则并以各种方式可靠定义,以便各方可以可靠地复制。当您考虑活动状态时,CPM安排真的很有趣。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号