Oil tank farm driven piles - a unique approach to downdrag reduction

机译:油库驱动桩-减少下阻力的独特方法

获取原文

摘要

What do you do when you have more downdrag than vertical support with a driven pile? Atlas Foundation Company faced this problem when looking at a project in the western part of North Dakota where the site had 15 feet of new fill overlying 55 feet of soft clay. "We were looking at driven pipe pile lengths of over 150 feet to support design loads of 25 tons", said Joel Zeltinger, P.E. the geotechnical engineer on the project. Atlas suggested using a steel pipe pile inside of a larger steel pipe pile shell. The outer pipe pile would act as a bond-breaker to protect the load-bearing pile from a portion of the downdrag and allow it to more efficiently transfer the load from the surface to the bearing soil at depth.
机译:如果您的下拖曳比带动桩的垂直支撑更多,该怎么办? Atlas基金会公司在北达科他州西部的一个项目中遇到了这个问题,该项目的新填埋场有15英尺,上面覆盖着55英尺的软土。 P.E. Joel Zeltinger说:“我们正在研究150英尺以上的驱动管桩长度,以支持25吨的设计载荷。”该项目的岩土工程师。 Atlas建议在较大的钢管桩壳内使用钢管桩。外管桩将充当破胶器,以保护承重桩免于部分向下拖曳,并使其能够更有效地将载荷从地面转移到深处的轴承土。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号