On April 27th, 2014, five tornadoes packing winds up to 200 miles per hour ripped through central Arkansas. Entergy's Mayflower EHV substation sustained a direct hit from one of the tornadoes registered as an EF4. Nearly 70% of the substation was destroyed. With summer load fast approaching, it was essential to return the substation to service as quickly as possible. This paper discusses a unique two phased approach to restoring this substation to normal. The first phase was a temporary solution that returned the substation to service by June 3rd, 2014; exactly 37 days after being destroyed. The second phase was the permanent solution that converted the existing 500KV ring bus to a breaker and a half arrangement. This construction occurred while the temporary solution was energized.
机译:2014年4月27日,阿肯色州中部刮起了五次龙卷风,时速高达200英里。 Entergy的五月花EHV变电站遭受了其中一架注册为EF4的龙卷风的直接袭击。变电站近70%被摧毁。随着夏季负荷的迅速临近,至关重要的是使变电站尽快恢复服务。本文讨论了一种独特的分两个阶段的方法来将该变电站恢复到正常状态。第一阶段是一个临时解决方案,该解决方案使变电站在2014年6月3日之前恢复了正常运行。恰好在被摧毁后的37天。第二阶段是永久性解决方案,将现有的500KV环形母线转换为断路器和一半布置。临时解决方案通电时发生了这种构造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号