首页> 外文会议>Annual Conference for Protective Relay Engineers >Entergy's Mayflower EHV substation tornado restoration
【24h】

Entergy's Mayflower EHV substation tornado restoration

机译:Entergy的五月花EHV变电站龙卷风恢复

获取原文

摘要

On April 27th, 2014, five tornadoes packing winds up to 200 miles per hour ripped through central Arkansas. Entergy's Mayflower EHV substation sustained a direct hit from one of the tornadoes registered as an EF4. Nearly 70% of the substation was destroyed. With summer load fast approaching, it was essential to return the substation to service as quickly as possible. This paper discusses a unique two phased approach to restoring this substation to normal. The first phase was a temporary solution that returned the substation to service by June 3rd, 2014; exactly 37 days after being destroyed. The second phase was the permanent solution that converted the existing 500KV ring bus to a breaker and a half arrangement. This construction occurred while the temporary solution was energized.
机译:2014年4月27日,五个龙卷风包装风,每小时高达200英里,撕裂了阿肯色州中部。 Entergy的Mayflower EHV变电站从作为EF4注册的龙卷风中的一个直接击中。 近70%的变电站被摧毁。 随着夏季负荷快速接近,必须尽快将变电站返回服务。 本文讨论了一个独特的两种分阶段方法,将这种变电站恢复到正常。 第一阶段是临时解决方案,将变电站返回服务于2014年6月3日; 爆炸后37天。 第二阶段是将现有500kV环总线转换为断路器和半排列的永久解决方案。 在临时解决方案通电时发生这种结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号