首页> 外文会议>International Conference on Lightning Protection >A new method to evaluate the lightning flashover risk of transmission line based on data mining
【24h】

A new method to evaluate the lightning flashover risk of transmission line based on data mining

机译:基于数据挖掘的输电线路雷击风险评估新方法

获取原文

摘要

Lightning flashover risk evaluation is the basis for choosing proper measures to improve the lightning performance of the transmission lines. Thus, the effectiveness of the measures adopted is directly determined by the evaluation accuracy. At present, the risks are mainly evaluated through comparing the calculated lightning flashover rate (LFOR) of every tower. However, there are so many assumptions and simplifications in the process of calculation. This way will often cause some discrepancies between the evaluated results and operating experience. A new evaluation method based on data mining will be proposed to study the characteristics of the lightning failure history. The association relationship between the lightning failure and altitude, height difference, relative height difference, ground flash density, etc. will be considered to build classification rules library to determine the tower lightning flashover risk. Comparison of the proposed evaluation method with the traditional methods shows that the results deduced through the proposed method is more agree with the operating experience.
机译:雷击危险评估是选择适当措施以改善传输线雷电性能的基础。因此,所采取措施的有效性直接取决于评估的准确性。目前,主要通过比较每座塔的雷电闪络率(LFOR)来评估风险。但是,在计算过程中有许多假设和简化。这种方法通常会导致评估结果与操作经验之间存在一些差异。提出了一种基于数据挖掘的评估方法,以研究雷电破坏历史的特征。考虑建立雷击失效与海拔高度,高度差,相对高度差,地闪密度等之间的关联关系,建立分类规则库,确定塔架雷击危险。所提出的评估方法与传统方法的比较表明,所提出的方法得出的结果与操作经验更加吻合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号