首页> 外文会议>International Conference on the European Energy Market >Long-term cycling costs in short-term unit commitment models
【24h】

Long-term cycling costs in short-term unit commitment models

机译:短期单位承诺模型中的长期循环成本

获取原文

摘要

Cycling of conventional power plants is becoming increasingly important in an electricity system with a large penetration of intermittent renewables. Power plant cycling entails short-term costs, e.g., additional fuel costs during start-up, and long-term costs, e.g., additional maintenance costs. Power plant operators should take long-term cycling costs into account when making short-term scheduling decisions, in order to reduce total generation costs. This paper presents a new approach to consider long-term start-up costs in a short-term unit commitment model. The approach is based on an iterative procedure, in which consecutively a unit commitment model is solved and the correct total start-up cost is recalculated. This new approach, referred to as the Cost Redistribution Unit Commitment (CRUC), is applied to a real-life case study based on the 2014 German electricity system. The performance of the CRUC model, in terms of generation costs and computational tractability, is compared with existing start-up cost formulations in the literature. The simulation results show that, for the considered case study, the CRUC model outperforms the existing formulations in terms of generation costs, but requires a longer run time.
机译:在间歇性可再生能源渗透率很高的电力系统中,常规电厂的循环变得越来越重要。电厂循环需要短期成本,例如,启动期间的额外燃料成本,以及长期成本,例如,额外的维护成本。电厂运营商在制定短期调度决策时应考虑长期循环成本,以降低总发电成本。本文提出了一种在短期单位承诺模型中考虑长期启动成本的新方法。该方法基于迭代过程,在该过程中,连续解决了单位承诺模型,并重新计算了正确的总启动成本。这种称为成本重新分配单位承诺(CRUC)的新方法被应用于基于2014年德国电力系统的实际案例研究中。在发电成本和计算可处理性方面,CRUC模型的性能与文献中现有的启动成本公式进行了比较。仿真结果表明,对于所考虑的案例研究,CRUC模型在发电成本方面优于现有的公式,但是需要更长的运行时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号