首页> 外文会议>Geo-China International Conference >Improvment of Micropile Capacities Casting with Pressure and Considering a Big Interval of Time
【24h】

Improvment of Micropile Capacities Casting with Pressure and Considering a Big Interval of Time

机译:考虑时间间隔较大的压力铸造微堆能力的提高

获取原文

摘要

This paper aims to compare and discuss the capacity of Micropiles casting with pressure in stages separated by different intervals of time. The comparison is based on casting concrete successively with pressure and waiting one hour interval. Preliminary geotechnical studies have been made in Sudan in specific area, and then an experimental works were carried for a number of Micropiles with different diameters and different techniques of placing concrete using various amount of pressure. Capacities of Micropiles were compared in cases of pressure casting with and without time interval more than one hour. It was proved that casting with pressure on stages spaced at interval more than one hour produces more capacity of Micropile.
机译:本文旨在比较和讨论在不同时间间隔分隔的阶段中具有压力的微型桩铸造的能力。比较的基础是先在压力下连续浇筑混凝土,然后等待一小时。在苏丹的特定地区已进行了初步的岩土研究,然后进行了许多具有不同直径的微桩的实验工作,以及使用不同压力施加混凝土的不同技术。比较了在有时间间隔和没有时间间隔超过一小时的情况下进行压铸的微型桩的能力。事实证明,在间隔大于一小时的阶段上施加压力进行铸造会产生更大的Micropile容量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号