首页> 外文会议>ASME international conference on ocean, offshore and arctic engineering >A STUDY OF POSSIBLE SOLUTIONS FOR COST EFFICIENT SUBSEA WELL ABANDONMENT
【24h】

A STUDY OF POSSIBLE SOLUTIONS FOR COST EFFICIENT SUBSEA WELL ABANDONMENT

机译:成本有效的浅层井控方案的可能解决方案研究

获取原文

摘要

There is a large number of subsea production wells offshore Norway approaching the end of their lifetime. Considering high spread rate of semisubmersible rigs, abandonment operations of these wells will be quite expensive. Moreover, Plug and abandonment (P&A) can easily contribute with 25% of the total costs of drilling for exploration wells offshore Norway. Hence it is of great importance to seek approaches and solutions to reduce the P&A cost. This paper reviews some possible new ways and also alternative technologies as the solutions to cut down the P&A expenses. Some of these technologies are now being used offshore Norway. In the first section of this paper, challenges of performing P&A operations offshore Norway together with the main cost drivers are discussed. It is then briefly argued how to consider issues such as barriers setting depth, cementing depth and logging in the design and well construction phases to ease or avoid future P&A challenges. For hydrocarbon exploitation in the Barents Sea and Arctic regions it is important to take into account the P&A phase in the early stage of planning and development. Light well intervention vessels as alternatives to semisubmersible rigs are recognized of being the largest contributor to cost saving. It will then be discussed to what extent vessel technologies can cut down the expenses for subsea abandonment. New ways of performing P&A can be another contributor to cost saving. It is shown how research and testing can assure the operators of new ways for performing P&A. Retrieval of production tubing is a challenging suboperation such that it imposes significant cost to subsea well abandonment. There have been performed studies on how P&A could be performed with tubing left in hole and it is of interest to pursue this further. We will investigate how the abandonment operations can be simplified and be more cost efficient if the production tubing can be left inside the well where the basic assumptions for being able to do it is accounted for. In addition, some complexities in abandonment operations can cause additional cost. An example of such complexities can be the need to establish two permanent barriers for potential permeable zones in overburden. It will be demonstrated how much can be saved with respect to cost if the regulations allow to ease some parts of abandonment operations. In this study, a probabilistic approach as a systematic tool to produce unbiased results is applied to quantify cost savings of new alternatives compared to the traditional ones.
机译:挪威近海的大量海底生产井正接近其使用寿命。考虑到半潜式钻井平台的高传播率,这些井的废弃作业将非常昂贵。此外,随插即用(P&A)可以轻松地贡献挪威海上勘探井钻探总成本的25%。因此,寻找降低P&A成本的方法和解决方案具有重要意义。本文将介绍一些可能的新方法以及替代技术,以降低P&A费用的解决方案。其中一些技术现在正在挪威近海使用。在本文的第一部分中,讨论了在挪威近海进行P&A业务的挑战以及主要的成本动因。然后简要讨论了如何在设计和施工阶段考虑障碍物设置深​​度,固井深度和测井等问题,以缓解或避免未来的P&A挑战。对于巴伦支海和北极地区的油气开采,重要的是在规划和开发的早期阶段考虑P&A阶段。轻井介入船作为半潜式钻井平台的替代品,被认为是节省成本的最大来源。然后将讨论船舶技术可以在多大程度上减少海底遗弃的费用。进行P&A的新方法可能是节省成本的另一个原因。它显示了研究和测试如何确保运营商采用新的方式进行P&A。取回生产油管是一项具有挑战性的子操作,因此,这给海底油井废弃带来了巨大的成本。已经进行了关于如何在管道留在孔中的情况下进行P&A的研究,因此有兴趣进行进一步研究。我们将研究如果将生产油管留在井内并能够做到这一点的基本假设,那么如何简化废弃作业并提高成本效益。另外,遗弃行动的某些复杂性可能导致额外的费用。这种复杂性的一个例子可能是需要为覆盖层中潜在的可渗透区域建立两个永久性屏障。将证明,如果法规允许简化遗弃操作的某些部分,则可以节省多少成本。在这项研究中,采用概率方法作为产生无偏结果的系统工具,与传统方法相比,该方法可量化新方法的成本节省。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号