Accelerated Bridge Construction of the Patroon Island Bridge Deck Replacement

机译:Patroon Island桥面更换的加速桥梁建设

获取原文

摘要

Rapid deck demolition & construction of the Patroon Island Bridge project is currently in progressand is using the “Best Value” concept by New York State Department of Transportation. The contract dollar valueis $145 million and was awarded to the joint venture of Halmar - A.Servidone/B.Anthony. This project is also partof the NY Work’s Accelerated Bridge Construction program, as well as the Driver’s First initiative. The maincomponent of the reconstruction of the Patroon Island Bridge is the deck replacement of the main river bridgeand interchange. This operation involved the removal of the existing deck and the installation of precast concretedeck panels with integral barriers. Construction procedures were designed for rapid deck replacement andstaged incrementally span by span during successive night or weekend closures to minimize impact on traffic. Atthe end of each work shift, the bridge was required to be open for traffic by providing temporary deck plates overopen joints between the existing and new decks, and grouting joints between adjacent new deck panels usingHigh-Early-Strength (HES) grout. Several means & methods were explored and implemented in order to get thework done most efficiently with placements of various crane types and configurations, during the various stagesof construction. In order to accommodate the staged construction, a moveable barrier system was required to beused for traffic on the I-90 corridor.
机译:正在进行Patroon Island Bridge项目的快速甲板拆除和建设 并采用了纽约州交通部的“最高价值”概念。合约价值 是1.45亿美元,由Halmar-A.Servidone / B.Anthony合资组建。这个项目也是一部分 NY Work的“加速桥梁建设”计划以及“驾驶员的第一个倡议”。主要的 Patroon Island大桥重建的组成部分是主河大桥的甲板更换 和互换。该操作涉及拆除现有甲板并安装预制混凝土 带有整体障碍物的甲板面板。设计施工程序是为了快速更换甲板和 在连续的晚上或周末关闭期间逐步扩展跨度,以最大程度地减少对流量的影响。在 在每个工作班次结束时,必须通过在桥上设置临时甲板来打开桥以供交通 现有甲板与新甲板之间的开放缝,以及相邻新甲板板之间的注浆缝,使用 高强度(HES)灌浆。探索并实现了几种方法和方法,以获取 在各个阶段,使用各种类型和配置的起重机进行最有效的工作 的建设。为了适应分阶段施工,需要使用可移动的屏障系统。 用于I-90走廊上的交通。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号