首页> 外文会议>Engineers' Society of Western Pennsylvania;Annual International Bridge Conference >Accelerated Construction Delivers SR 288 Bridge Replacement in Seven Days
【24h】

Accelerated Construction Delivers SR 288 Bridge Replacement in Seven Days

机译:加速施工可在七天内完成SR 288桥梁的更换

获取原文

摘要

This project replaced a severely deteriorated concrete arch bridge carrying SR 288 over WampumRun in Lawrence County, PA with a 78’-0” long rolled steel beam structure on integral abutments. The paper willdescribe the innovative ABC design and construction techniques used in order to minimize the inconvenience tothe traveling public to just 7 days. The bridge features prefabricated elements, precast substructures and 3-twobeam modules connected using Ultra High Performance Concrete.
机译:该项目取代了在Wampum上承载严重破坏的混凝土拱桥SR 288 在宾夕法尼亚州的劳伦斯县(Lawrence County)运行,其整体式基台具有78'-0”长轧钢梁结构。本文将 描述所使用的创新性ABC设计和施工技术,以最大程度地减少对用户的不便 到公众旅行只需要7天。这座桥具有预制构件,预制子结构和三至二层结构 使用超高性能混凝土连接的梁模块。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号