【24h】

FUEL SURVEILLANCE RESULTS FROM THE FIRST TiO_2 APPLICATION IN A BWR PLANT

机译:BWR工厂中首次使用TiO_2的燃料监控结果

获取原文

摘要

TiO_2 injection technology has been developed as an intergranular stress corrosion cracking (IGSCC) mitigation countermeasure for BWR plants and was successfully applied during the course of plant shutdown at the Unit-1 of Fukushima-Daini Nuclear Power Station of Tokyo Electric Power Company in 2010. The TiO_2 chemical was injected to the primary coolant system in order to deposit TiO_2 onto the structural materials to prevent IGSCC. The TiO-2 deposition amount onto the structural materials and the fuel rods were measured during the following maintenance outage period. The oxide thickness of the fuel cladding with TiO_2 pre-coated one cycle before the application was measured and turned out to be within an allowable range.
机译:TiO_2注入技术已被开发为BWR工厂的晶间应力腐蚀开裂(IGSCC)缓解对策,并已于2010年在东京电力公司福岛第一核电站的1号机组停产期间成功应用。为了将TiO_2沉积到结构材料上以防止发生IGSCC,将TiO_2化学药品注入到主冷却液系统中。在随后的维护停机期间,测量了TiO-2在结构材料和燃料棒上的沉积量。测量在涂覆前一个循环预涂有TiO_2的燃料包壳的氧化物厚度,结果发现其在允许范围内。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号