Two adjacent deep shafts in east London involved excavation to 30 m below standing groundwater level and required temporary control of pressures in the Lower Aquifer below the London Clay. Three distinct aquifer horizons were present comprising the Lambeth Group channel sands, Thanet Sand and Chalk. One of the shafts was constructed using a circular diaphragm wall with a reinforced concrete base slab and the second shaft was constructed using SCL techniques with a domed base. The different structural approaches plus slightly differing depths led to radically differing requirements for groundwater control which are explored in this paper. One of the shafts required substantial lower aquifer pressure relief which was achieved using deepwells targeting the Chalk plus a combination of external pumped Thanet Sand wells and internal passive wells separately targeting the Thanet Sand and Lambeth Group. The second shallower shaft was successfully constructed using internal passive relief wells.
机译:伦敦东部的两个相邻深井涉及挖掘到地下地下水位以下30 m,并需要临时控制伦敦黏土下方的下含水层中的压力。存在三个不同的含水层层,包括Lambeth组河道砂,Thanet砂和Chalk。其中一根竖井是使用带有钢筋混凝土基础平板的圆形隔板墙建造的,而第二根竖井是采用SCL技术和拱形基座建造的。不同的结构方法加上略微不同的深度导致对地下水控制的根本不同要求,本文对此进行了探讨。其中一个竖井要求大幅降低含水层压力,这是通过使用针对Chalk的深井以及分别针对Thanet Sand and Lambeth集团的外部泵送Thanet砂井和内部被动井的组合来实现的。第二个较浅的井筒是使用内部被动泄压井成功建造的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号