Hooley cutting stabilisation

机译:胡利切削稳定

获取原文

摘要

Hooley Cutting on the north side of the North Downs just south of Croydon, is on the main London Brighton railway line and over 175 years old. In recent years there have been a number of land slips from the steep cutting sides. Following preparation work over the Christmas period at the end of 2011, Network Rail commissioned the stabilisation to this cutting. An internal collaboration between BAM Nuttall Rail and specialist geotechnical division BAM Ritchies successfully carried out the work, completing it in early 2013. The project was a double winner at the 2013 ICE SE Engineering Excellence Awards as well as winning Project of the Year at the 2014 Ground Engineering Awards. This paper provides a short history of the issues necessitating the stabilisation work, will cover the design development aspects as well as the geotechnical and construction techniques including the management of environmental issues (dealing with the presence of 'Roman Snails' - a protected species). Advanced track protection measures, steep slope soil nailing techniques using rope supported and excavator mounted drilling rigs and the innovative sprayed concrete beam and grillage system, allowed the remedial solution to be completed during normal rail operations, not affecting passenger journeys.
机译:霍利切割区位于克罗伊登(Croydon)以南的北唐斯(North Downs)的北侧,位于伦敦布赖顿主要铁路线上,已有175年的历史。近年来,在陡峭的切割面出现了许多滑坡。在2011年底的圣诞节期间进行了准备工作之后,Network Rail委托对该切割进行稳定化处理。 BAM Nuttall铁路公司和BAM Ritchies专业岩土工程部门之间的内部合作成功完成了该工作,并于2013年初完成了该项目。该项目获得了2013 ICE SE工程卓越奖的双冠王,并获得了2014年度最佳项目的称号。地面工程奖。本文提供了需要进行稳定工作的问题的简短历史,将涵盖设计开发方面以及包括环境问题管理在内的岩土和施工技术(应对“罗马蜗牛”(一种受保护物种)的存在)。先进的轨道保护措施,使用绳索支撑和挖掘机安装的钻机的陡坡土钉技术以及创新的喷射混凝土梁和格栅系统,使补救方案能够在正常的铁路运营期间完成,而不会影响乘客的出行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号