SANTA MARIA DE GARONA NPP IC CHALLENGES TO LONG-TERM OPERATION

机译:SANTA MARIA DE GARONA NPP I&C长期运营面临的挑战

获取原文

摘要

Santa Maria de Garona (SMG) Nuclear Power Plant is a GE BWR/3 connected to the grid in 1971 and operated by Nuclenor, S.A. It is owned by two of the largest Spanish electrical utilities, Endesa and Iberdrola, each with 50% ownership. Garona was powered down in December 2012 due to financial reasons and was formally closed for decommissioning in July 2013. One year later, SMG has applied to re-open the plant until 2031. To ensure the continued safe, reliable and efficient operation of a Nuclear Power Plant (NPP), it is essential to address obsolescence, aging and reliability Instrumentation and Control (I&C) Issues, and must therefore take into consideration these three major issues with the following goals: (1) To ensure that current analog and digital I&C systems are not life-limiting issues for the operation of the plant. (2) To implement digital Instrumentation, Information & Control systems (Ⅱ&C) technologies, improving efficiency and performance of the internal work processes. (3) To monitor the main assets of the plant, targeting operation and management costs. This paper will describe the strategy developed for a single unit, in this case the SMG NPP, to face the above mentioned challenges. 1. To address the first issue, a Short-Term planning for the modernization projects has been established to cope with aging, obsolescence and reliability issues. 2. And a Long-Term planning has been established to carry out changes in the plant from the current I&C paradigm to a new Ⅱ&C paradigm which assists in improving the efficiency and reliability while at the same time optimizing costs, consequently supporting a long-term sustainable plant operation approach with new technologies such as Predictive Analytics or Internet of Things (IoT).
机译:圣玛丽亚·德加罗纳(SMG)核电站是GE BWR / 3于1971年并网的电网,由南卡罗来纳州的Nuclenor运营。它由西班牙两家最大的电力公司恩德萨和伊贝德罗拉拥有,各自拥有50%的所有权。由于财务原因,Garona于2012年12月停电,并于2013年7月正式停运。一年后,SMG申请重新开放该工厂,直至2031年。以确保核电的持续安全,可靠和高效运行。电厂(NPP),解决过时,老化和可靠性仪表与控制(I&C)问题至关重要,因此必须考虑这三个主要问题,并实现以下目标:(1)确保当前的模拟和数字I&C系统不是工厂运行的寿命限制问题。 (2)实施数字仪表,信息与控制系统(Ⅱ&C)技术,提高内部工作流程的效率和性能。 (3)监视工厂的主要资产,以运营和管理成本为目标。本文将描述为应对上述挑战而为单个机组(在本例中为SMG NPP)开发的策略。 1.为了解决第一个问题,已经制定了现代化项目的短期计划,以应对老化,过时和可靠性问题。 2.并制定了长期计划,以在工厂中进行从当前I&C范例到新的Ⅱ&C范例的更改,该范例有助于提高效率和可靠性,同时优化成本,因此可以长期支持采用诸如预测分析或物联网(IoT)等新技术的可持续工厂运营方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号