The Glane River is a French stream highly artificialized. It displays 20 transversal structures inducing rupture in the continuity. In the context of the Water Framework Directive, several restoration works have been scheduled between 2014 and 2016. A station in the head of the watershed including 3 successive weirs intended for removal has been selected for evaluating the river response to incoming changes. A specific methodology has been applied in order to assess the morphological evolution of the stream. It includes regular measurements of transversal and longitudinal geometric key values, and granulometric composition. The serial of measurements made before the first removal have helped to highlight reductions of sediment and biological communities continuity across the linear implied in the study. Particular degradation among diversity of hydraulic profiles and size classes of substrate have been identified in areas between weirs. The gradual decrease of the hydrological dynamics and the proportion of lotic fish species from downstream to upstream were observed. The first weir removal was conducted in July 2014, inducing direct release of large amounts of fines from the reservoir. Campaigns have been made between 3 and 5 months after the beginning of works upstream and downstream of the removed structure. A gradual deposition of fine sediments has been observed downstream while their withdrawal from the reservoir resulted in the emergence of coarser material. The most significant observation of these mid-term measurements is the channelization of the upstream linear in parallel with the reduction of the bed width and augmentation of lotic profiles encountered.
机译:格兰河是高度人工化的法国溪流。它显示20个横向结构,导致连续性破裂。根据《水框架指令》,已计划在2014年至2016年之间进行几项修复工作。已选择在流域顶部的一个站台,其中包括3个连续的要拆除的堰,以评估河流对即将到来的变化的响应。已应用一种特定的方法来评估流的形态演变。它包括横向和纵向几何关键值的常规测量以及粒度组成。首次去除之前进行的一系列测量有助于突出研究中所暗示的线性范围内沉积物减少和生物群落连续性。在堰之间的区域中,已经确定了水力剖面和基底尺寸类别的多样性之间的特定退化。从下游到上游,观察到水文动力的逐渐降低和乐鱼种类的比例。于2014年7月进行了第一次堰的拆除,导致从水库中直接释放出大量的细屑。在拆除结构上游和下游开始工作后的3到5个月内进行了运动。在下游观察到细沉积物逐渐沉积,而从储层中抽出却导致出现了较粗的物质。这些中期测量结果中最重要的观察结果是上游线性通道的通道化,同时降低了床宽并增加了所遇到的乳液分布。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号