首页> 外文会议>International Conference on Bioinformatics and Biomedical Engineering >Primary Practice of Green Mine Construction in Limestone Mine
【24h】

Primary Practice of Green Mine Construction in Limestone Mine

机译:石灰石矿井绿色矿井建设的初步实践

获取原文

摘要

Overall project of geologic environment comprehend- sive harnessing and landscape rehabilitation is put forward in production practice of Tangshan Sanyou Mine Corporation by using systems engineering process. Instructive research on building "Green Mine" demonstration plot in Hebei Province is realized in construction project which give attention to economic benefit of the mine and environmental factors. Linear programming is built for comprehensive utilization of waste rock in the orebody roof. And brief arts and crafts plan of waste dump ground reclamation is given.
机译:利用系统工程流程,提出了地质环境理解和景观康复的整体项目,提出了唐山三欧矿山公司的生产实践。建筑项目中建设“绿色矿井”演示情节的教学研究,施工项目得到了对矿井与环境因素的经济效益的关注。线性编程是为矿石屋顶的垃圾岩石综合利用而建立的。给出了废物垃圾接地填海的简要艺术和工艺品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号