首页> 外文会议>Annual meeting of the transportation research board;Transportation Research Board >Performance and Benefits of Michigan DOT’s Capital Preventive Maintenance Program
【24h】

Performance and Benefits of Michigan DOT’s Capital Preventive Maintenance Program

机译:密歇根州交通运输部资本预防性维护计划的绩效和收益

获取原文

摘要

The Michigan Department of Transportation’s (MDOT) pavement preservation program dates back to 1992. In Michigan pavement preservation is primarily implemented through MDOT’s capital preventive maintenance (CPM) program, in which preventive maintenance treatments are used to protect existing pavement surfaces, slow deterioration, and correct surface deficiencies. An overall objective of the CPM program is to postpone major rehabilitation and reconstruction activities by extending the service life of pavements. This paper presents the results of a study performed to calculate the benefits and costs of various preventive maintenance treatments used in MDOT’s CPM program. Defining the benefit as the percent increase in performance over a “do nothing” or untreated pavement performance curve, where data were available benefits were calculated for preventive maintenance treatments. Using unit costs, benefit-cost ratios were calculated, permitting the comparison of the costeffectiveness of similar treatments. The overall performance of MDOT’s CPM program was also examined by comparing the life-cycle costs (LCC) of a rehabilitation strategy to a preservation strategy using a simplified approach. The outcome showed that the preservation strategy results in agency cost savings of approximately 25 percent per lane-mile over a rehabilitation-onlystrategy. Findings from this study can be used to help MDOT improve its CPM project selection, treatment selection, and performance monitoring and modeling practices.
机译:密歇根州交通运输部(MDOT)的路面养护计划的日期 可以追溯到1992年。在密歇根州,路面养护主要是通过MDOT的 基本预防性维护(CPM)程序,其中预防性维护方法 用于保护现有的人行道表面,缓慢变质和正确的表面 缺陷。 CPM计划的总体目标是推迟重大的康复和 通过延长人行道的使用寿命进行重建活动。 本文介绍了一项旨在计算各种收益和成本的研究结果 MDOT的CPM计划中使用的预防性维护治疗。将利益定义为 在“不执行任何操作”或未经处理的路面性能曲线上的性能提高百分比, 在可获得数据的地方,对预防性维护治疗的收益进行了计算。 使用单位成本,可以计算效益成本比,从而可以比较成本 相似治疗的有效性。 MDOT的CPM计划的整体效果也不错 通过比较康复策略和保护措施的生命周期成本(LCC)进行了检查 使用简化方法的策略。结果表明,保存策略的结果 在仅进行康复的情况下,每车道英里的代理成本节省约25% 战略。这项研究的结果可用于帮助MDOT改进其CPM项目的选择, 治疗选择以及性能监测和建模实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号