首页> 外文会议>Annual meeting of the transportation research board;Transportation Research Board >Evaluation of HERO Coordinated Ramp Metering Installation at the M1/M3 Freeway in Queensland, Australia
【24h】

Evaluation of HERO Coordinated Ramp Metering Installation at the M1/M3 Freeway in Queensland, Australia

机译:澳大利亚昆士兰州M1 / M3高速公路的HERO协调坡道计量安装评估

获取原文

摘要

The recently developed traffic-responsive feedback control strategy HERO (HEuristic Rampmetering cOordination), that coordinates local ramp-metering actions in freeway networks, wasimplemented at the M1/M3 Freeway in Queensland, Australia. HERO employs an extendedversion of the feedback regulator ALINEA at the local level. HERO outperforms uncoordinatedlocal ramp metering and approaches the efficiency of sophisticated optimal control schemes.HERO has been implemented by TMR (Transport and Main Roads), the road authority for thestate of Queensland, Australia, at six on-ramps of the M1/M3 Freeway. The obtained resultsshow significant improvements in traffic throughput and travel times compared with thepreviously used fixed-rate ramp-metering system. A rapid economic benefit analysis concludedon a benefit-cost ratio (BCR) of 13.8:1 at a 7% discount rate, and hence a very strong economicmerit for the implementation of HERO. The economic payback period for capital expenditure onthis pilot is approximately 4 months.
机译:最近开发的交通响应反馈控制策略HERO(启发式斜坡) 协调高速公路网络中的本地坡度测量动作) 在澳大利亚昆士兰州的M1 / M3高速公路上实施。 HERO采用了扩展 本地的反馈调节器ALINEA版本。 HERO胜过不协调的人 本地斜坡计量并接近复杂的最佳控制方案的效率。 HERO已由TMR(运输和主要道路)实施,TMR是 澳大利亚昆士兰州,位于M1 / M3高速公路的六个匝道上。获得的结果 与 以前使用的固定速率斜坡计量系统。快速经济效益分析得出结论 收益成本比(BCR)为13.8:1,折现率为7%,因此经济增长非常强劲 实施HERO的优点。资本支出的经济投资回收期 该飞行员大约需要4个月的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号