首页> 外文会议>Annual Conference and Expo of the Institute of Industrial Engineers >Application of Lean and 5S for Redraw Machine in Bellow Industry: A Case Study
【24h】

Application of Lean and 5S for Redraw Machine in Bellow Industry: A Case Study

机译:瘦手和5S在轰隆性工业中的应用 - 以案例研究为例

获取原文

摘要

Manufacturing companies straggle to meet a fluctuating market demand and deal with issues of price, quality and Lead (cycle) times. A slow change over in redraw presses has been one of the main constraints for the production process in bellow manufacturing plant. When the demand of the factory's products is high, this becomes the bottleneck among all the operations. Several problems prevent this part of the process to be faster and leaner such as: lack of standardization during the machine setup, improper scheduling, irregular arrangement of tools, waste of time during machine handling, high number of internal activities and low number of external ones, etc. Lean tool was applied to reduce the time and make the production flow smooth. A case study was conducted in a manufacturing plant in Knoxville and results are presented. The result shows substantial improvement in the process.
机译:制造公司秉承市场需求波动,并处理价格,质量和铅(周期)次的问题。 Redraw压力的缓慢变化是波纹管制造厂生产过程的主要约束之一。当工厂产品的需求很高时,这成为所有操作中的瓶颈。几个问题可以防止该过程的一部分更快,更精简,例如:在机器设置过程中缺乏标准化,调度不当,工具不规则排列,机器处理期间浪费时间,内部活动数量较多,外部活动较少。等等。应用瘦工具来减少时间,使生产流动平滑。在诺克斯维尔的制造厂中进行了案例研究,并提出了结果。结果显示了该过程的显着改善。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号