Protection of the 400 kV OHL support foundation structure against a disaster caused by the Dunajec River meandering

机译:保护400 kV OHL支撑基础结构免受杜纳耶茨河蜿蜒造成的灾难

获取原文

摘要

The paper discusses the protection of the 400 kV OHL support foundation structure against a potentialdisaster caused by a sudden change of River’s stream direction.First part of the article refers to the meandering of Dunajec River, the second part refers to themeandering of Wisłok River.Part OneDuring the flood in June 2010, the Dunajec River meandered towards the existing support position,shifting its stream channel by several dozen meters. Formed 8-10 meters away from the supportposition was an escarpment about 6 meters high as the bank of the Dunajec River bed. The escarpmentis continuously eroded by the strong current along its outer meander. There is an extremely high riskof the escarpment being washed out by the river, which would pose an immediate threat to the safetyof the 400 kV power line whose support position may find itself in the very river current. This wouldundoubtedly result in the destruction of a section of the line with the approximate length of about1,690 meters, comprising three suspension supports, and additionally in the risk of damage to twotension supports at the ends of that section. In the course of works aimed at identifying the methods toprotect the power line against the potential breakdown that would result in considerable material losses(removal of the debris, reconstruction of the line, damages) and in power cuts during thereconstruction, a number of potential solutions were considered:a) River bank protection,b) Reconstruction of the line along the present or a modified route,c) “Reinforcement” of the support foundation.Following consultations with the Investor, option c) was chosen which guaranteed the relativelylowest cost and shortest duration of the works combined with a short shut-down period.The design involved protection of the support position by means of encasing the existing supportfoundation with a cuboid of cavity walls.The cavity walls were designed as 80 cm thick barrettes set at the depth of about 15 meters. Early inthe spring of 2011, execution of the foundation reinforcement started according to the agreed andapproved design. The whole of the works took 10 weeks. During the construction works, the line wasshut down over a period of 5 weeks only for the execution of the underground cavity walls.Part Two:When building 400 kV OHL Krosno-Tarnów (2003-2005) at the stage of designing the line it occurredthat Station no 189 is situated very close (around 30m) to the bank of the Wisłok River. The WisłokRiver is meandering in the neighbourhood of the tower foundations. The local government and theowner of the river decided that at the stage of designing, the foundation of the tower should beprotected before being destroyed by possible changes of the course of the river. The foundation wasdesigned as the group of 4 Franki piles foundations (per one leg) and additionally protected by steelwalls made of special steel braces to the 8m depth. The building permission was given and line wasbuilt.
机译:本文讨论了400 kV OHL支撑基础结构的潜在保护措施 河流方向突然改变而造成的灾难。 本文的第一部分是指杜纳耶茨河的蜿蜒曲折,第二部分是指杜纳耶茨河的蜿蜒曲折。 威斯洛克河蜿蜒而行。 第一部分 在2010年6月的洪水期间,杜纳耶茨河(Dunajec River)蜿蜒向现有的支持位置 将其河道移动几十米。距支撑物8-10米 位置是一个陡峭的悬崖,距杜纳耶茨河床的河岸约6米。悬崖 沿其外曲折不断被强电流侵蚀。风险极高 被河水冲刷掉的悬崖,这将对安全构成直接威胁 400 kV电力线的一部分,其支撑位置可能恰好位于河流中。这个会 无疑会破坏大约长度约为的线段 1,690米,包括三个悬架支撑,另外还有损坏两个的风险 该部分末端的张力支撑。在旨在确定方法的工作过程中 保护电源线免受可能导致大量材料损失的潜在击穿 (清除杂物,重建线路,损坏)以及在停电期间 重建,考虑了许多潜在的解决方案: a)河岸保护, b)沿目前或修改后的路线重建线路, c)“加强”支持基金会。 在与投资者协商后,选择了选项c),以保证相对 最低的成本和最短的工期,加上较短的停工期。 设计涉及通过包裹现有支撑物来保护支撑物位置 具有长方体形空腔壁的地基。 空腔壁设计成80厘米厚的发夹,设置在约15米的深度。早在 2011年春季,根据商定的条件开始执行基础加固工作。 批准的设计。整个作品耗时10周。在施工过程中,生产线是 在5周内关闭,仅用于执行地下洞壁。 第二部分: 在设计线路时建造400 kV OHLKrosno-Tarnów(2003-2005) 189号车站离Wisłok河河岸很近(约30m)。维斯洛克 河在塔基附近蜿蜒曲折。地方政府和 河的所有者决定在设计阶段,塔的基础应为 在受到河道的可能变化破坏之前受到保护。基础是 设计为一组4个Franki桩基础(每条腿),并由钢保护 特殊钢支架制成的墙壁深度为8m。已获得建筑许可,线路为 内置的。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号