Asset management methodology for optimization of long term replacement plan for aged facilities

机译:优化陈旧设施的长期更换计划的资产管理方法

获取原文

摘要

As the growth rate of peak system demand in Kansai’s supplying area has slowed down, construction work oriented to expansion of the power system has considerably decreased. Given this situation, facilities in the power transmission system are likely to be used to the extent of their lifetime. As a result, the amount of aged assets requiring refurbishment grows year by year. Without any attempt to cope with this situation, problems related to skilled workforce, determining the planned outage and capital investment are concerned to arise in the near future. In other words, an optimal plan for feasible replacement work and capital investment over the long-term must be developed in order to deal with the situation.Considering this situation, Kansai has been in the process of introducing an asset management scheme since the year 2000, and has made various revisions to the long-term plan. In addition, an ICT system called MMST (Maintenance Management System on Transmission sector) has been implemented in order to realize efficient workflow when making and revising the plan. A long-term plan for replacement can be easily constructed using this system, despite the massive quantity of power transmission system facilities. Furthermore, Kansai is trying to reduce the average level of capital investment from some aspects, revising the average lifetime of, and cost of replacing, each type of facility, and rationalizing power system structures on replacement. Furthermore, in order not to give a large impact to transmission tariffs in the future, the total result of revised long-term planning for capital investment is also side-checked from the perspective of transmission tariffs. In this paper, we introduce Kansai’s scheme of asset management, and its results.
机译:随着关西供电地区高峰期系统需求的增长速度放慢,面向电力系统扩展的建设工作已大大减少。在这种情况下,电力传输系统中的设施可能会在其使用寿命内使用。结果,需要翻新的陈旧资产的数量逐年增加。在没有任何应付这种情况的尝试的情况下,在不久的将来会出现与熟练的劳动力,确定计划的停机和资本投资有关的问题。换句话说,必须制定长期可行的替代工作和资本投资的最佳计划,以应对这种情况。 考虑到这种情况,关西自2000年以来一直在制定资产管理计划,并对长期计划进行了各种修订。此外,为了制定和修改计划时实现高效的工作流程,已经实施了一种称为MMST(传输部门的维护管理系统)的ICT系统。尽管有大量的输电系统设施,使用该系统仍可轻松构建长期更换计划。此外,关西正试图从某些方面降低平均资本投资水平,修改每种设施的平均使用寿命和更换成本,并在更换时合理化电力系统结构。此外,为了将来不会对输电费产生重大影响,还从输电费的角度对经过修订的资本投资长期计划的总体结果进行了核查。在本文中,我们介绍了关西的资产管理方案及其结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号