摘要

Elia has the objective to expand its 380 kV grid from the inland (near Ghent) to the coast (Zeebrugge). The length of this new 380 kV link is about 50 km and in combination with 5 new substations, including a AC/DC converter station, it is one of the largest grid expansion projects of the last decades in Belgium. It is a challenge to complete the authorisation process of such a large scale development and public acceptance is one of the key issues to success. Although connection of renewable onshore and offshore production is the main driver of the project, still strong NIMBY reactions from the public and local authorities are encountered. The grounds of these reactions are diverse but the three main issues are visual impact, property value and health concern.From the initial study phase on and throughout the authorisation process different measures were worked out in order to encounter these public concerns. The proposed grid solution includes several mitigating techniques (HTLS conductors, insulated cross-arms) in order to maximise the re-use of and the bundling with existing infrastructures. As a result only 20% of the connection needs to be constructed as a new cross country route, for this section an underground cable solution has been chosen.As a result of a detailed landscape study, additional visual integration measures all along the route have been proposed. Finally a compensation policy was developed to address the concerns about loss of property value.These different mitigating and compensating measures elaborated have demonstrated their effectiveness to enhance public expectance for this kind of large grid infrastructure projects. Nevertheless a small number of stakeholders keep their NIMBY position and jeopardise the project by legal actions.
机译:Elia的目标是将其380 kV电网从内陆(根特附近)扩展到海岸(Zeebrugge)。这条新的380 kV链路的长度约为50 km,并与5个新的变电站(包括一个AC / DC换流站)相结合,是比利时近几十年来最大的电网扩展项目之一。完成如此大规模开发的授权过程是一个挑战,而公众的接受是成功的关键问题之一。尽管可再生陆上和海上生产的连接是该项目的主要推动力,但公共和地方当局仍然强烈反对NIMBY。这些反应的依据各不相同,但三个主要问题是视觉影响,财产价值和对健康的关注。 从最初的研究阶段到整个授权过程,都制定了各种措施来解决这些公众关注的问题。提议的网格解决方案包括多种缓解技术(HTLS导体,绝缘横臂),以最大程度地利用现有基础架构并使其与之捆绑在一起。结果,仅20%的连接需要构建为一条新的越野路线,为此,本节选择了地下电缆解决方案。 作为详细景观研究的结果,已经提出了沿途的其他视觉整合措施。最后,制定了补偿政策来解决对财产价值损失的担忧。 详细阐述的这些不同的缓解和补偿措施已证明它们在提高公众对此类大型电网基础设施项目的期望方面的有效性。但是,少数利益相关者保持其NIMBY立场,并通过法律行动危害了该项目。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号