首页> 外文会议>IEEE International Telecommunications Energy Conference >What Does A Telco Need for 400 VDC To Find A Place In The Central Office 400 Volts: Even Though The Technology Isn't Quite Here Yet, It's Not Just For Data Centers Anymore
【24h】

What Does A Telco Need for 400 VDC To Find A Place In The Central Office 400 Volts: Even Though The Technology Isn't Quite Here Yet, It's Not Just For Data Centers Anymore

机译:Telco需要400个VDC在中央局400伏的地方找到什么:即使这项技术还不在这里,它不仅仅是数据中心

获取原文

摘要

There's little doubt that 400volts (nominal) is coming. Which architecture wins the race depends on the lifecycle cost of deploying the system and whatever politicking governs decisions in a particular carrier's engineering department. Very clearly, one of the weightiest factors in total cost of ownership is the system end-to-end efficiency. The number of power conversions between the building service entrance and the electronic systems actually using the power figures mightily in overall efficiency. Since most electronic circuit boards utilize 5 volts, 12 Volts or some similar dc potential, virtually all electronic systems employ a power supply to convert whatever is the supply voltage to the board level voltage(s). For data center systems the source voltages are 120VAC and 208VAC or other potentials depending on where in the world the systems will be deployed. The development of embedded dc to dc converters that will convert a nominal 400 volts dc to server board level voltages paves the way for so-called high voltage dc data centers and as of this writing it's believed that such soon will be the case. The advantages of such a topology are well known to those who have been around INTELEC for more than a few years. Improved end to end efficiency through reduced power conversion stages plays a major role in reducing the overall energy cost and environmentally, the carbon footprint. Not only is the cost of powering the electronics tamped down, but also the cost of cooling the facility. To paraphrase character Mr. Mayagi in the movie Karate Kid, the line "Wax on, wax off he uses to teach his young student Karate stances while waxing a car. In our world, Watt in, Watt out becomes the watchword for controlling power and environmental cooling costs. With all that said, in discrete numbers there aren't all that many data centers in the world as compared with the plethora of telecommunications central offices. Therefore, improving efficiency and reducing the cost of power systems feeding the telecommunications network - including central offices might just be the Holy Grail of the telecommunications energy business over the next decade or so. The commodity cost of copper aside, the sheer volume of cable, the space it takes up and the effort needed to install and one day remove it all result in a fairly high lifecycle cost of the traditional 48 volt energy system. Further, as will be shown herein, providing a high voltage dc potential and then converting it to an intermediate 48 Volt potential comes at a very high operating cost for "extra" conversion equipment and the energy lost in converter inefficiency and added cooling cost.
机译:毫无疑问,400Volts(标称)即将到来。哪种架构赢得了比赛取决于部署系统的生命周期成本,以及任何政治管理特定运营商的工程部门的决策。非常清楚,总体拥有成本中最有货的因素之一是系统端到端效率。建筑物服务入口与电子系统之间的电力转换数实际上在整体效率中使用功率数据。由于大多数电子电路板利用5伏,12伏或一些类似的直流电位,因此几乎所有电子系统都采用电源来转换到板电平电压的电源电压。对于数据中心系统,源电压为120VAC,208VAC或其他潜力,具体取决于世界的位置将部署的系统。将标称400伏特DC转换为服务器板电平电压的嵌入​​式DC到DC转换器的开发为所谓的高压DC数据中心铺平了道路,并且仿佛这种撰写据信这很快就是这种情况。这种拓扑的优势是众所周知的,那些已经依靠依赖的人超过几年。通过降低的功率转换阶段改进的端到端效率在降低整体能源成本和环境方面发挥了重要作用,碳足迹。不仅为电子设备夯实供电的成本,而且还是冷却设施的成本。为了释放角色Mayagi Mayagi Mayagi先生在电影空手道上,这条线“蜡上,蜡像从他用来教导他的年轻学生空手道立场,同时打蜡一辆车。在我们的世界里,瓦特,瓦特成为控制权力的手表环境冷却费用。与所有人说,在离散数量中,与世界上的许多数据中心与电信中央办公室相比,世界上许多数据中心。因此,提高了效率,降低了馈送电信网络的电力系统成本 - 包括中央办公室可能只是在未来十年左右的电信能源业务的圣杯。除了铜的商品成本,电缆的纯粹体积,占据所需的空间以及安装的努力和一天删除它所有导致传统的48伏能量系统的相当高的生命周期成本。此外,如本文所示,提供高电压直流电位,然后将其转换为介质TE 48伏电位以“额外”转换设备和转换器低效率损失的能量为非常高的运营成本,并增加了冷却成本。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号