首页> 外文会议>IEEE International Symposium on Industrial Electronics >An integrated ACO approach for the joint production and preventive maintenance scheduling problem in the flowshop sequencing problem
【24h】

An integrated ACO approach for the joint production and preventive maintenance scheduling problem in the flowshop sequencing problem

机译:流动测序问题中联合生产和预防性维护调度问题的集成ACO方法

获取原文

摘要

In this paper, an integrated ACO approach to solve joint production and preventive maintenance scheduling problem in permutation flowshops is considered. A newly developed ant-colony algorithm is proposed and analyzed for solving this problem, based on a common representation of production and maintenance data, to obtain a joint schedule that is, subsequently, improved by a new local search procedure. The goal is to optimize a common objective function which takes into account both maintenance and production criteria. We compare the results obtained with our algorithm to those of an integrated genetic algorithm developed in previous works. The results and experiments carried out indicate that the proposed ant-colony algorithm provide very effective solutions for this problem.
机译:在本文中,考虑了一个集成的ACO方法来解决置换范围中的联合生产和预防性维护调度问题。提出并分析新开发的蚁群算法,以解决该问题的基于生产和维护数据的共同表示,以获得随后,通过新的本地搜索程序改进的联合时间表。目标是优化一个共同的目标函数,该函数考虑了维护和生产标准。我们将通过算法获得的结果与以前的作品中开发的综合遗传算法进行了比较。进行的结果和实验表明,所提出的抗殖民地算法为此问题提供了非常有效的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号