首页> 外文会议>International conference on nuclear engineering >The Analysis of AP1000 Beyond Design Basis DEDVI Accident
【24h】

The Analysis of AP1000 Beyond Design Basis DEDVI Accident

机译:AP1000超出设计基准DEDVI事故的分析

获取原文

摘要

Double ended break of direct vessel injection line (DEDVI) is the most typical small-break lost of coolant accident (LOCA) in AP 1000 nuclear power plant. This study simulated the DEDVI (without actuation of automatic depressurization system 1-3 stage valves, accumulators and passive residual heat removal heat exchanger) beyond design basis accident(BDBA) to validate the safety capability of AP1000 under such conditions. The results show that the core will be uncovered for about 863 seconds and then recovered by water after gravity injection from IRWST into the pressure vessel. The peak cladding temperature (PCT) goes up to 838.08°C, much lower than the limiting value 1204°C。 This study confirms that in the DEDVI beyond design basis accident ,the passive core cooling system (PXS) can effectually cool the core and preserve it integrate, and ensure the safety of AP 1000 nuclear power plant.
机译:直接容器喷射管线(DEDVI)的双头中断是AP 1000核电厂中最典型的冷却剂事故小事故损失(LOCA)。本研究模拟了超出设计基准事故(BDBA)的DEDVI(无自动降压系统1-3级阀门,蓄能器和被动余热去除热交换器的启动),以验证在这种情况下AP1000的安全能力。结果表明,岩心将被发现约863秒,然后在从IRWST重力注入压力容器后被水回收。峰值包层温度(PCT)高达838.08°C,远低于极限值1204°C。这项研究证实,在DEDVI超出设计基准事故的情况下,无源堆芯冷却系统(PXS)可以有效地冷却堆芯并冷却。保持其集成,并确保AP 1000核电站的安全。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号