首页> 外文会议>Danube-European Conference on Geotechnical Engineering >Monitoring consolidation works executed on a road by inclinometer measurements
【24h】

Monitoring consolidation works executed on a road by inclinometer measurements

机译:监控整合作品通过倾斜计测量在路上执行

获取原文

摘要

In the past years, 400 m length of Romanian National Road DN15 was affected by serious landslide phenomena and differential ground settlement. Torrential and heavy rain in the past years, increased the activity of landslides and posed serious threats to infrastructure of the road, affecting the entire traffic in the area. To stop the landslide a discontinuous reinforcement screen was executed consisting of drilled piles with a 880 mm diameter to a depth of 18 m solidarity with reinforced concrete beam and a network of deep-water drains which lowers the water table within 9m depth, below the sliding surface. To ensure the safety and sustainability of construction was imposed the implementation of a monitoring program of intervention works by equipping five piles with inclinometers. By registering, processing and interpretation of the values obtained by measurements, we determined if construction requirements maintain their strength, stability and durability established by the project.
机译:在过去几年中,罗马尼亚国家道路DN15的400米受到严重滑坡现象和差动地面定居的影响。过去几年的暴雨,增加了山体滑坡的活动,对道路的基础设施构成了严重威胁,影响了该地区的整个交通。为了停止滑坡,由钻孔桩组成,由880毫米直径的钻平面组成,与钢筋混凝土梁和深水漏斗网络的深度,将水位放在9米深度下方的深水漏斗中,以至于滑动下方表面。为确保建设的安全和可持续性施加了通过装配五堆的倾角系数的干预措施的实施。通过注册,加工和解释通过测量获得的值,我们确定了施工要求是否保持了项目所建立的强度,稳定性和耐用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号