UPSTREAM OPTIONEERING - OPTIMISING HIGHER ACTIVITY WASTE MANAGEMENT

机译:上游选配-优化更高的废物管理

获取原文

摘要

The Upstream Optioneering project was created by the Nuclear Decommissioning Authority (NDA) Radioactive Waste Management Directorate (RWMD) to support the development and implementation of opportunities to optimise the management of UK higher activity waste, spent fuel and other materials that may be disposed of in a geological disposal facility. The project works in an integrative manner with the NDA, RWMD and waste producers, and was split into three phases: 1. In Phase 1 waste management opportunities were identified and collated from across the NDA estate. 2. In Phase 2, opportunities collated during Phase 1, were further consolidated, analysed and prioritised to develop a three year work programme. Prioritisation ensured that resources were deployed appropriately and opportunities can be realised before the potential benefit diminishes. 3. Phase 3, which began in April 2012, comprises a three year work programme to address the prioritised opportunities. Work varies from direct implementation of opportunities to scoping studies that may pave the way for more detailed subsequent work by Site Licence Companies. The work programme is flexible and, subject to change control, varies depending on the needs of project sponsors (RWMD, NDA Strategy and NDA Delivery). This paper provides an overview of the Upstream Optioneering project (focusing particularly on Phases 2 and 3), summarises work carried out to date within the three year work programme, and provides some examples of the main findings concerning specific opportunities from Year One of the Phase 3 work programme.
机译:上游淘汰工程项目是由核退役管理局(NDA)放射性废物管理局(RWMD)创建的,旨在支持开发和实施各种机会,以优化对英国高放射性废物,乏燃料和其他可能在处置中处置的材料的管理。地质处置设施。该项目与NDA,RWMD和废物产生者进行了整合,分为三个阶段:1.在第一阶段中,从NDA遗产中识别并整理了废物管理机会。 2.在第2阶段中,对第1阶段中收集的机会进行了进一步的合并,分析和优先排序,以制定一项三年工作计划。优先级确定了资源的适当部署,并且在潜在利益减少之前就可以实现机会。 3.第三阶段于2012年4月开始,包括一个为期三年的工作计划,以解决优先机会。从直接实施机会到进行范围界定研究,工作可能会有所不同,这可能会为站点许可证公司进行更详细的后续工作铺平道路。工作计划是灵活的,并且受变更控制的约束,视项目发起人的需求(RWMD,NDA策略和NDA交付)而定。本文概述了上游期权咨询项目(特别侧重于第2和第3阶段),总结了迄今为止在三年工作计划中开展的工作,并提供了有关该阶段第一年特定机会的主要发现的一些示例3工作方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号