RISK MANAGEMENT FOR LATERAL CHANNEL MOVEMENT AT PIPELINE WATER CROSSINGS

机译:输水管道横向通道移动的风险管理

获取原文

摘要

Pembina Pipeline Corporation (Pembina) owns and operates close to 10,000 km of crude, natural gas liquids (NGL), and natural gas pipelines across North America, with the majority of assets in western Alberta and eastern British Columbia. The Pembina pipeline network includes over 1,600 river and stream crossings, most of which are subject to varying degrees of vertical and/or lateral erosion. 1,260 crossings were in Alberta at the onset of the study. Identifying potential lateral erosion hazards is a critical component of geohazard management program for pipeline integrity. In 2012, Pembina initiated a three-phase program to proactively address lateral-stability issues at river and stream crossings in Alberta: phase one identified and short-listed crossings that have potential lateral channel-shifting problems; phase two assessed which short-listed crossings have insufficient cover depth to accommodate the potential channel-shifting activities and ranked these crossings as high risk of exposure; and phase three will develop plans for repair and/or replacement of the high-risk crossings. Through this program, Pembina explores the significance of lateral erosion and encroachment at pipeline water crossings of various vintages, with regards to pipeline integrity. This paper provides discussion as to how crossing geohazard risks are identified, with particular emphasis on stream bank erosion, and how this fits into Pembina's overall risk management program. As well, selected case studies are provided.
机译:Pembina管道公司(Pembina)在整个北美拥有并经营近10,000公里的原油,天然气液体(NGL)和天然气管道,其中大部分资产位于艾伯塔省西部和不列颠哥伦比亚省东部。 Pembina管网包括1600多个河流和溪流交叉口,其中大部分受到不同程度的垂直和/或横向侵蚀。研究开始时,阿尔伯塔省有1,260个过境点。识别潜在的横向侵蚀危害是地质灾害管理计划中确保管道完整性的关键组成部分。 2012年,彭比纳(Pembina)发起了一个分为三个阶段的计划,以主动解决艾伯塔省河流和河流过境点的横向稳定性问题:第一阶段已确定和入围的过境点可能存在横向河道平移问题;第二阶段评估了哪些入围名单不足的穿越深度不足以容纳潜在的航道转移活动,并将这些穿越归类为高暴露风险;第三阶段将制定维修和/或更换高风险过境点的计划。通过该程序,Pembina探究了各个年份的管道水交叉口的横向侵蚀和侵蚀对管道完整性的重要性。本文讨论了如何识别跨界地质灾害风险,特别是对河岸侵蚀的关注,以及这如何适合Pembina的整体风险管理计划。此外,还提供了一些案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号