首页> 外文会议>International pipeline conference >DEVELOPMENT AND PRODUCTION OF HEAVY GAUGE X80 AND HIGH STRENGTH X90 PIPELINE STEELS UTILIZING TMCP/OPTIMIZED COOLING PROCESS
【24h】

DEVELOPMENT AND PRODUCTION OF HEAVY GAUGE X80 AND HIGH STRENGTH X90 PIPELINE STEELS UTILIZING TMCP/OPTIMIZED COOLING PROCESS

机译:利用TMCP /优化冷却工艺开发重规格X80和高强度X90管线钢

获取原文

摘要

Along with the increasing demand of oil and natural gas by various world economies, the operating pressure of the pipeline is also increasing. Large diameter heavy wall X80 pipeline steel is widely used in the long distance high pressure oil and gas transportation in China today. In addition, development of X90/X100 has begun in earnest to support the growing energy needs of China. With the wide use of X80 steels, the production technology of this grade has become technically mature in the industry. Shougang Group Qinhuangdao Shouqin Metal Materials Co., Ltd. (SQS) since 2008 has been steadily developing heavier thicknesses and wider plate widths over the years. This development has resulted in stable mass production of X80 pipeline steel plate in heavy wall thicknesses for larger pipe OD applications. The technical specifications of X80 heavy wall thickness and X90/X100 14.8-19.6 mm wall thicknesses, large OD (48") requiring wide steel plates for the 3rd West-to-East Natural Gas Transmission Pipeline Project and the third line of Kazakhstan-China Main Gas Pipeline (The Middle Asia C Line) and the demonstration X90/X100 line (part of the 3rd West-East Project) in China required changes to the SQS plate mill process design. Considering the technology capability of steelmaking and the plate mill in SQS, a TMCP+OCP (Optimized Cooling Process) was developed to achieve stable X80 and X90/X100 mechanical properties in the steel plates while reducing alloy content. This paper will describe the chemistry, rolling process, microstructure and mechanical properties of X80 pipeline steel plates produced by SQS for 52,000 mT offer the 3rd West-to-East Natural Gas Transmission Pipeline Project and 5,000 mT for the Middle Asia C Line Project along with 1000 tons of 16.3 mm X90/X100 for the 3rd West-East demonstration pipeline. The importance of the slab reheating process and rolling schedule will be discussed in the paper. In addition, the per pass reductions logic used during recrystallized rough rolling, and special emphasis on the reduction of the final roughing pass prior to the intermediate holding (transfer bar) resulting in a fine uniform prior austenite microstructure will be discussed. The optimized cooling (two phase cooling) application after finish rolling guarantees the steady control of the final bainitic microstructure with optimum MA phase for both grades. The plates produced by this process achieved good surface quality, had excellent flatness and mechanical properties. The pipes were produced via the JCOE pipe production process and had favorable forming properties and good weldability. Plate mechanical properties successfully transferred into the required final pipe mechanical properties. The paper will show that the TMCP+OCP produced X80 heavy wall and 16.3 mm X90 wide plates completely meet the technical requirements of the three pipeline projects.
机译:随着世界各个经济体对石油和天然气需求的增加,管道的运行压力也在增加。大直径重壁X80管线钢在当今的中国长距离高压油气运输中得到了广泛的应用。此外,X90 / X100的开发也已开始认真进行,以支持中国不断增长的能源需求。随着X80钢的广泛使用,该级别的生产技术在行业中已变得技术成熟。首钢集团秦皇岛首秦金属材料有限公司(SQS)自2008年以来一直在稳步发展较厚的厚度和较宽的钢板宽度。这一发展使X80管道钢板的厚壁厚度稳定,可大量生产,可用于较大的管道​​外径应用。 X80重壁厚和X90 / X100壁厚14.8-19.6 mm,大外径(48“)的技术规范,用于西气东输三期管道工程和哈萨克斯坦-中国第三条管道需要宽钢板考虑到中国炼钢和中厚板轧机的技术能力,中国的主要天然气管道(中亚C线)和示范X90 / X100管线(西三期工程的一部分)需要对SQS中厚板轧机工艺设计进行更改。 SQS是一种TMCP + OCP(优化冷却工艺),旨在在降低合金含量的同时实现稳定的X80和X90 / X100钢板机械性能,本文将介绍X80管线钢的化学,轧制工艺,显微组织和力学性能。 SQS生产的52,000 mT的中厚板提供了第三条西气东输管道项目,中亚C线项目提供了5,000 mT的产品,第三条西部提供了1000吨的16.3 mm X90 / X100 -东部示范管道。本文将讨论板坯再加热过程和轧制计划的重要性。另外,将讨论在再结晶粗轧过程中使用的每道次减少逻辑,并特别强调在中间保持(传送棒)之前产生最终的奥氏体组织细微均匀的最后一次粗化道次的减少。精轧后的优化冷却(两相冷却)应用可确保对最终贝氏体组织的稳定控制,且两种级别的MA均具有最佳的MA相。通过这种方法生产的板获得了良好的表面质量,具有出色的平整度和机械性能。这些管道是通过JCOE管道生产工艺生产的,具有良好的成型性能和良好的可焊性。板的机械性能成功转化为所需的最终管道机械性能。本文将表明,TMCP + OCP生产的X80厚壁板和16.3 mm X90宽板完全可以满足三个管道项目的技术要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号