首页> 外文会议>International symposium on geotechnical aspects of underground construction in soft ground >South Toulon tube: 3D numerical back-analysis on in situ measurements
【24h】

South Toulon tube: 3D numerical back-analysis on in situ measurements

机译:South Toulon Tube:3D原位测量的数值背分析

获取原文

摘要

Full face excavation with ground reinforcement has become a common technique to build large tunnels in soft rock or hard soil. Nevertheless, at the design phase, it remains difficult to assess the effect of the different construction and reinforcement elements on the control of the ground movements and settlements. In order to improve the understanding of ground response to this tunnelling method, a monitoring section has been installed during the construction of the south Toulon tunnel (France). An important database was obtained and subsequently used for numerical back-analysis. A 3D FE calculation, modeling the real reinforcement system and construction stages, was then performed. The satisfactory matching between the numerical results and the in situ measurements shows that the three-dimensional numerical model with an explicit modeling of the reinforcement elements is a reliable tool to simulate the complex phenomenon of interaction between the excavation process, the reinforcements and the ground reaction.
机译:全面挖掘与地面加固已成为在软岩或硬土中构建大隧道的常用技术。然而,在设计阶段,它仍然难以评估不同建筑和加固元件对地面运动和定居点控制的影响。为了改善对该隧道方法的地面响应的理解,在南塔隆隧道(法国)的建设期间已经安装了监控部分。获得了一个重要的数据库,随后用于数值背分分析。然后进行3D FE计算,建模真正的强化系统和施工阶段。数值结果与原位测量之间的令人满意的匹配表明,具有强化元件的明确建模的三维数值模型是一种可靠的工具,用于模拟挖掘过程之间的相互作用的复杂现象,增强剂和地面反应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号