首页> 外文会议>International symposium on geotechnical aspects of underground construction in soft ground >Building response to underground construction: the New City Court case history
【24h】

Building response to underground construction: the New City Court case history

机译:建设地下建设的回应:新城市法院案件历史

获取原文

摘要

New City Court in Southwark, southeast London, was recently affected by the construction of London Bridge underground station during the Jubilee Line Extension Project. It consists of two separate but linked structures: a Victorian terrace and a piled 4-storey reinforced concrete framed office block. Protective measures, comprising compensation grouting within the underlying London Clay, were implemented from a temporary grouting adit adjacent to the Victorian terrace, to control the movements of the buildings during the underground construction works. The responses of the two structures, as well as the construction joint at their junction, to the various construction activities was monitored by a variety of methods, including precision levelling and crack measurement. The results of this monitoring together with contour plots of grout injection intensity are presented in this paper as well as a discussion of the observed responses of the structures. It is demonstrated that the compensation grouting protective measures controlled ground settlements such that the maximum building movements recorded were less than 35 mm.
机译:伦敦东南部的南方南市新城市法院最近受到Jubilee线推广项目期间伦敦桥地铁站建设的影响。它由两个独立但连接的结构组成:维多利亚式露台和堆积的4层钢筋混凝土框架办公室块。包括在伦敦粘土内的薪酬灌浆的保护措施,从毗邻维多利亚大型露台的临时灌浆娱乐,以控制地下建设工作中建筑物的运动。通过多种方法监测两种结构以及它们交界处的建筑接头的响应,包括各种方法,包括精密水平和裂纹测量。本文提出了该监测的结果与灌浆喷射强度的轮廓图以及对结构的观察到响应的讨论。证明补偿灌浆保护措施控制地面沉降,使得记录的最大建筑运动小于35毫米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号