Ground movements caused by tunnelling with an earth pressure balance machine: A greenfield case study at Southwark Park, London

机译:用地球压力平衡机隧穿引起的地面运动:伦敦南威克公园的绿地案例研究

获取原文

摘要

This paper reviews ground movements induced by a 5m diameter earth pressure balance machine at an extensively monitored greenfield site on Contract 105 of the Jubilee Line Extension. Tunnelling was at a depth of 21m through dewatered dense granular soil. Only small ground movements occurred: a maximum settlement of 5mm was observed at the ground surface and 12mm just above the tunnel crown. Movement in front of the tunnelling shield was negligible, most settlement was associated with convergence of soil around the shield and into the tail void. Long-term monitoring has shown no evidence of consolidation; in fact seasonal surface ground movements are of similar magnitude to those caused by the tunnelling. Tunnelling machine parameters measured during the drives are presented and discussed in relation to the ground movements.
机译:本文评论了在Jubilee线延伸的合同105的广泛监测的绿地网站上在广泛监测的绿地网站上进行地面运动。通过脱水致密粒状土壤隧道渗透为21米。只发生了小的接地运动:在地面观察到5mm的最大沉降,沿隧道冠上方12mm。隧道罩前面的运动可以忽略不计,大多数沉降与屏蔽周围的土壤的收敛性和尾部空隙有关。长期监测显示没有巩固证据;事实上,季节性表面地面运动与由隧道引起的那些相似的大小。在驱动器期间测量的隧道机参数被呈现并讨论了地面运动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号