首页> 外文会议>International symposium on heating, ventilation and air conditioning >Study on Heat Transfer of Soil Thermal Recovery of Ground Source Heat Pump System
【24h】

Study on Heat Transfer of Soil Thermal Recovery of Ground Source Heat Pump System

机译:地源热泵系统土壤热回收的传热研究

获取原文

摘要

The imbalance of heat extracted from the soil by the ground heat exchangers (GHEs) in winter, and rejected into it in summer is expected to affect the long-term performance of ground source heat pump (GSHP) in areas of southern China. This chapter presents a new operation mode to resolve this problem that in summer night the intermittent operation of GHEs with the cooling tower as the supplemental heat rejecter of GSHP system and in transition seasons the coupling operation of cooling tower combined with the GHEs. The practical analytical model of GHEs based on the line-source theory is established. The computer program based on established model is developed to do the feasibility analysis under the proposed operating mode for a GSHP system in Nanjing of southern China. The results indicate that the imbalance problem of the rejected/ extracted heat for the GSHP system in Nanjing of southern China is effectively resolved. In addition, under the proposed operating mode the COP of heat pump unit can be improved, design capacity of cooling tower can be reduced and utilization rate of cooling tower throughout the year can also be increased. The results can improve the energy efficiency of GSHP system.
机译:冬季,地面换热器(GHE)从土壤中提取的热量不平衡,而夏季则排入土壤,这可能会影响中国南部地区的地源热泵(GSHP)的长期性能。本章提出了一种新的运行模式,以解决该问题:夏季夜晚,冷却塔作为GSHP系统的补充排热装置间歇运行,而在过渡季节,冷却塔与GHE结合运行。建立了基于线源理论的实际GHEs分析模型。开发了基于已建立模型的计算机程序,以在建议的操作模式下对中国南方南京的GSHP系统进行可行性分析。结果表明,有效解决了中国南方南京地区GSHP系统排热/排热不平衡的问题。另外,在提出的工作模式下,可以提高热泵机组的COP,可以降低冷却塔的设计能力,还可以提高全年的冷却塔利用率。结果可以提高GSHP系统的能源效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号