首页> 外文会议>International Conference on Information Technology and Electrical Engineering >Modeling and Simulation to Improve 66 kV Overhead Transmission Lines Performance toward Lightning Strike
【24h】

Modeling and Simulation to Improve 66 kV Overhead Transmission Lines Performance toward Lightning Strike

机译:建模与仿真,提高66千伏架空输电线路性能对雷击

获取原文

摘要

Outages due to lightning stroke frequently occur on the overhead transmission line operating under tropical conditions. The high lightning flash density makes a higher probability of having either shielding failure or back flashover at the tower. Therefore, mitigation is necessary. This paper evaluates options to improve the 66 kV tower design against a lightning strike. Provided models evaluate effect of polarity, strike time, and lightning peak currents on the performance of 66 kV overhead transmission lines also two scenarios of improving shielding protection, i.e., by additional ground wire and by elevating the cone top of the tower.
机译:由于雷电行程引起的中断经常发生在热带条件下运行的架空传输线上。高雷电闪光密度使得在塔架上具有屏蔽失效或背闪光灯的概率更高。因此,减缓是必要的。本文评估了改进66千伏塔设计的选项,防止雷击。提供了型号评估极性,打击时间和雷电峰值电流的效果,对66 kV架空传输线的性能也是改善屏蔽保护的两个场景,即通过额外的接地线,并通过抬起塔的锥形顶部。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号