首页> 外文会议>International Conference on Systems and Informatics >Analysis and Suggestions on Peak Shaving of Hunan AC-DC Hybrid Power Grid with Large-scale New Energy
【24h】

Analysis and Suggestions on Peak Shaving of Hunan AC-DC Hybrid Power Grid with Large-scale New Energy

机译:大规模新能源湖南AC-DC混合动力电网峰剃的分析与建议

获取原文

摘要

In recent years, the installation of new energy in Hunan province has been developing rapidly and impact on peak shaving of its randomness and fluctuation have also been increasing. Meanwhile, after the operation of Qi Shao HVDC project, due to the demand for power generation at the valley load of flood season is significant, the problem concerning consumption of new energy is further emphasized. This paper analyses the load characteristics and the output characteristics of wind power supply in Hunan Province, analyses the demand and capacity of peak shaving using the actual operation data of Hunan, and discusses the influence of new energy output and foreign power on the peak regulation of Hunan power grid. Based on the research results, in view of the difficulty and crux of the peak shaving in Hunan, this paper proposes some suggestions to improve the peak shaving ability of Hunan province.
机译:近年来,湖南省新能源的安装已经迅速发展,对其随机性的峰值剃须的影响以及波动也在增加。同时,在齐邵高潮项目的运作后,由于对汛期的山谷负荷的发电需求显着,进一步强调了新能源消耗的问题。本文分析了湖南省风电源的负荷特性和输出特性,分析了利用湖南实际运作数据的峰值剃须的需求和能力,探讨了新能源输出与外国电力对峰值调节的影响湖南电网。根据研究成果,鉴于湖南剃须的难度和症状,本文提出了提高湖南省峰值剃须能力的一些建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号