首页> 外文会议>International astronautical congress >LESSONS LEARNED AND FOLLOW-UPS TO EDUCATIONAL CUBESAT PROJECTS GAINED IN THE PW-SAT PROJECT
【24h】

LESSONS LEARNED AND FOLLOW-UPS TO EDUCATIONAL CUBESAT PROJECTS GAINED IN THE PW-SAT PROJECT

机译:在PW-SAT项目中获得的经验教训和后续的教育CUBESAT项目

获取原文

摘要

The CubeSat standard is getting more popular in the world. In next years number of CubeSats launched will reach 100, and perhaps even more. Most of them were built and are being built for educational and scientific purposes, where thousands of students are involved in the development process. That makes a difficult situation to any project manager as well as team to avoid circumstances which could make difficulties to fulfill mission goals. Experiences and knowledge gained in the PW-Sat project, which was launched on 13th February 2012 on the Vega Maiden Flight as the very first Polish satellite, as well as other CubeSat projects launched on the same launcher too, let to conclude this overall process into the complete lesson learned summary. The example of the PW-Sat project gives a list of issues related with software, hardware as well management which provides complete guidelines for any developing project, especially new educational project's players whose goal is to develop first CubeSat within their institutions or countries. The topic of lessons learned can be split into sections which cover following parts: project management, system engineering, mission design, satellite developing process and post launch operations. The example of the PW-Sat gives a comprehensive analysis of issues met during all project phases, in example: lack of automatic modes which made a problem with meeting mission goals, too short test campaign which influenced on the power budget, and so on. In result the PW-Sat satellite, which was intended to test the new deorbitation system based on a drag augmentation device, could not reach all mission success levels. The analysis of the lessons learned performed by the PW-Sat team implicated a need to provide guidelines for the next satellite project { the PW-Sat 2, which is intended to be 2U CubeSat and equipped in more devices and payloads than the first one, for example the sail to deorbit the satellite, and the new type of the sun sensor which has been never tested in space. It also forces on requirements on any level of the project to avoid circumstances which could be predicted as well as to minimize a risk of failure during mission in space. These lessons, as a good practice, could be shared to those organizations and institutions which are going to develop their first CubeSats, and to help them to build better projects and reach assumed mission goals.
机译:CubeSat标准在世界上越来越流行。未来几年,发射的CubeSat数量将达到100个,甚至可能更多。他们中的大多数人都是为教育和科学目的而建造的,正在为成千上万的学生参与发展过程而努力。对于任何项目经理和团队来说,这都是一件困难的事情,要避免可能难以实现任务目标的情况。在PW-Sat项目中获得的经验和知识,该项目于2012年2月13日在Vega Maiden Flight上作为波兰的第一颗卫星发射,以及在同一发射器上发射的其他CubeSat项目,让我们将整个过程总结为以下内容完整的课程总结。 PW-Sat项目的示例列出了与软件,硬件以及管理相关的问题列表,该列表为任何正在开发的项目提供了完整的指南,尤其是新的教育项目参与者,其目标是在其机构或国家/地区中首先开发CubeSat。经验教训的主题可以分为几个部分,包括以下部分:项目管理,系统工程,任务设计,卫星开发过程和发射后操作。 PW-Sat的示例对所有项目阶段中遇到的问题进行了全面分析,例如:缺乏自动模式,这无法满足任务目标;测试时间太短,影响了功率预算,等等。结果,旨在测试基于减阻装置的新型脱轨系统的PW-Sat卫星无法达到所有任务的成功水平。 PW-Sat团队对所汲取的经验教训进行的分析表明,有必要为下一个卫星项目(PW-Sat 2,该项目旨在成为2U CubeSat,并配备比第一个卫星更多的设备和有效载荷)提供指南,例如,帆将卫星解轨道,以及从未在太空中进行过测试的新型阳光传感器。它还会在项目的任何级别上施加要求,以避免发生可以预见的情况,并最大程度地减少太空任务期间发生故障的风险。作为一个好的实践,可以将这些课程分享给那些将要开发第一个CubeSat并帮助他们建立更好的项目并实现预定任务目标的组织和机构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号