首页> 外文会议>International astronautical congress >Integrated Testing Approaches for the NASA Ares I Crew Launch Vehicle
【24h】

Integrated Testing Approaches for the NASA Ares I Crew Launch Vehicle

机译:美国宇航局的综合测试方法我员工机组人员

获取原文

摘要

The Ares I crew launch vehicle is being developed by the U.S. National Aeronautics and Space Administration (NASA) to provide crew and cargo access to the International Space Station (ISS) and, together with the Ares V cargo launch vehicle, serves as a critical component of NASA's future human exploration of the Moon. During the preliminary design phase, NASA defined and began implementing plans for integrated ground and flight testing necessary to achieve the first human launch of Ares I. The individual Ares I flight hardware elements-including the first stage five segment booster (FSB), upper stage, and J-2X upper stage engine-will undergo extensive development, qualification, and certification testing prior to flight. Key integrated system tests include the upper stage Main Propulsion Test Article (MPTA), acceptance tests of the integrated upper stage and upper stage engine assembly, a full-scale integrated vehicle ground vibration test (IVGVT), aerodynamic testing to characterize vehicle performance, and integrated testing of the avionics and software components. The Ares I-X development flight test will provide flight data to validate engineering models for aerodynamic performance, stage separation, structural dynamic performance, and control system functionality. The Ares I-Y flight test will validate ascent performance of the first stage, stage separation functionality, validate the ability of the upper stage to manage cryogenic propellants to achieve upper stage engine start conditions, and a high-altitude demonstration of the launch abort system (LAS) following stage separation. The Orion 1 flight test will be conducted as a full, un-crewed, operational flight test through the entire ascent flight profile prior to the first crewed launch.
机译:我的战神乘员运载火箭是由美国国家航空和航天局(NASA)开发提供船员和货物前往国际空间站(ISS),并与战神5号货物运载火箭一起,作为一个重要组成部分的月球NASA的未来人类探索。在初步设计阶段,美国航空航天局定义,并开始实施综合地面和飞行测试要实现人类首次推出的战神计划一,个人战神一号飞行硬件元素,包括第一阶段五段助推器(FSB),上面级和J-2X上面级发动机,将进行广泛的开发,认证和认证飞行之前进行测试。键集成系统测试包括上级主推进测试条(MPTA),集成的上段和上段发动机的验收测试组件,全面集成的车辆的地面振动试验(IVGVT),空气动力学试验来表征车辆性能,并且集成航空电子设备和软件组件的测试。战神I-X开发的飞行测试将提供飞行数据来验证设计模型的气动性能,级间分离,结构动态性能和控制系统的功能。战神IY飞行测试将验证第一阶段的上升表现,级间分离的功能,验证上面级的管理低温推进剂来实现上面级发动机启动条件的能力,以及发射中止系统的高空示范(LAS )以下阶段分离。提供的Orion 1飞行测试将作为一个完整的,未载人,操作飞行通过第一载人发射之前的整个飞行上升曲线测试来进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号